Aes thumbnail

Turkish Chamber of Electrical Engineers (TMMOB) 2021 Minimum Wage Definitions

CHAPTER VII - 2021 MINIMUM WAGE DEFINITIONS 185 186 2021 MINIMUM WAGE DEFINITIONS The general rules regarding the 2021 Minimum Wages were adopted by the EMO Board of Directors at its meeting dated 14.11.2020 and numbered 47/14, pursuant to the authority granted by the 47th Ordinary General Assembly of the Chamber of Electrical Engineers held on 22-23 August 2020 and Article 6 of the Turkish Union of Chambers of Engineers and Architects Chambers of Electrical Engineers Minimum Wage and Professional Supervision Implementation Principles Regulation, published in the Official Gazette dated 09.12.2010 and numbered 27780, and entered into force as of 01.01.2021. The EMO Board of Directors is responsible for the implementation of the minimum wages. 187 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services 188 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 PART I - IN-BUILDING ELECTRICAL INSTALLATION ENGINEERING SERVICES AND MINIMUM FEES PROJECT TENDER FILE (PID) FEES BUILDING AREA m² 1A CLASS 210.00 TL/m² OK=1.13 1B CLASS 310.00 TL/m² OK=1.26 2A CLASS 510.00 TL/m² OK=0.69 2B CLASS 750.00 TL/m² OK=1.00 2C CLASS 820.00 TL/m² OK=1.09 3A CLASS 1.100,00 TL/m² OK=0.86 3B CLASS 1.450,00 TL/m² OK=0.78 4A CLASS 1.550,00 TL/m² OK=0.85 4B CLASS 1.850,00 TL/m² OK=0.83 4C CLASS 2.000,00 TL/m² OK=0.85 5A CLASS 2.400,00 TL/m² OK=0.77 5B CLASS 2.900,00 TL/m² OK=0.79 5C CLASS 3.250,00 TL/m² OK=0.82 5D CLASS 3.800,00 TL/m² OK=0.84 100 200 300 400 500 600 700 800 900 1,000 1,100 1,200 1,300 1,400 1,500 1,600 1,700 1,800 1,900 2,000 2,200 2,400 2,600 2,800 3,000 3,200 3,400 3,600 3,800 4,000 4,200 4,400 4,600 4,800 5,000 6,000 7,000 8,000 9,000 10,000 12,500 15,000 17,500 20,000 22,500 25,000 27,500 30,000 35,000 40,000 45,000 50,000 55,000 60,000 70,000 80,000 90,000 100,000 420 823 1,180 1,507 1,786 2,049 2,283 2,469 2,639 2,763 2,997 3,229 3,447 3,664 3,866 4,068 4,254 4,440 4,626 4,798 5,123 5,403 5,713 6,071 6,396 6,738 7,033 7,344 7,638 7,903 8,182 8,493 8,710 8,959 9,145 10,542 11,784 12,948 14,237 15,448 17,947 20,447 22,558 24,515 26,330 27,899 29,172 30,181 32,323 34,745 36,624 38,860 40,738 42,244 46,094 49,013 55,145 61,278 699 1,335 1,925 2,453 2,935 3,370 3,742 4,053 4,316 4,533 4,922 5,295 5,651 6,009 6,334 6,661 6,986 7,282 7,576 7,856 8,415 8,849 9,362 9,952 10,480 11,039 11,520 12,032 12,529 12,948 13,414 13,910 14,268 14,672 14,997 17,264 19,313 21,223 23,335 25,337 29,420 33,503 36,997 40,179 43,176 45,722 47,817 49,463 52,987 56,962 60,036 63,715 66,789 69,258 75,561 80,357 90,387 100,432 1,320 2,546 3,680 4,736 5,682 6,552 7,313 7,996 8,632 9,083 9,874 10,619 11,349 12,032 12,716 13,352 13,973 14,562 15,137 15,680 16,690 17,590 18,599 19,748 20,851 21,921 22,853 23,831 24,778 25,663 26,424 27,231 28,007 28,737 29,296 33,627 37,462 41,188 44,977 48,438 56,759 63,917 70,127 76,600 81,616 85,605 89,983 92,840 101,208 108,551 115,274 121,747 126,949 132,397 143,809 152,176 171,210 190,228 1,507 2,904 4,192 5,388 6,475 7,452 8,321 9,098 9,828 10,340 11,240 12,095 12,917 13,709 14,469 15,200 15,898 16,581 17,218 17,839 18,988 20,027 21,161 22,465 23,738 24,949 26,005 27,123 28,193 29,218 30,073 30,988 31,873 32,696 33,348 38,285 42,648 46,886 51,187 55,145 64,600 72,750 79,830 87,188 92,887 97,435 102,419 105,663 115,196 123,564 131,217 138,576 144,492 150,702 163,696 173,213 194,870 216,528 1,801 3,463 5,015 6,443 7,731 8,911 9,967 10,884 11,753 12,374 13,461 14,469 15,448 16,394 17,311 18,180 19,034 19,841 20,617 21,347 22,729 23,956 25,337 26,889 28,396 29,855 31,128 32,463 33,736 34,962 35,987 37,090 38,146 39,139 39,899 45,815 51,031 56,107 61,247 65,981 77,300 87,064 95,526 104,328 111,159 116,593 122,554 126,452 137,847 147,860 157,020 165,823 172,917 180,338 195,880 207,290 233,202 259,112 2,096 4,053 5,885 7,592 9,160 10,604 11,908 13,088 14,128 15,044 16,317 17,528 18,708 19,841 20,990 22,031 23,039 24,002 24,933 25,881 27,510 28,955 30,708 32,557 34,233 35,941 37,556 39,123 40,598 41,872 43,191 44,449 45,644 46,746 47,600 54,509 60,548 66,292 72,284 78,138 90,852 101,937 111,935 121,374 128,377 136,278 141,915 147,177 160,265 171,536 181,518 190,787 199,869 209,324 226,402 241,306 271,470 301,636 2,500 4,829 7,017 9,036 10,915 12,622 14,190 15,587 16,829 17,932 19,437 20,897 22,294 23,645 25,011 26,253 27,464 28,613 29,700 30,833 32,774 34,513 36,593 38,798 40,800 42,818 44,759 46,606 48,376 49,882 51,466 52,971 54,385 55,704 56,728 64,957 72,145 78,991 86,133 93,104 108,256 121,468 133,376 144,631 152,968 162,392 169,098 175,387 190,974 204,402 216,310 227,348 238,170 249,441 269,779 287,539 323,479 359,420 2,873 5,589 8,151 10,526 12,747 14,811 16,705 18,444 19,996 21,410 23,194 24,918 26,641 28,241 29,855 31,408 32,836 34,186 35,568 36,794 39,185 41,203 43,455 46,032 48,500 50,860 53,112 55,254 57,117 59,026 60,827 62,520 64,103 65,594 66,726 76,244 84,487 92,545 100,835 108,396 125,815 141,418 154,629 167,608 177,281 186,735 194,141 200,862 221,573 236,834 252,095 264,158 278,053 289,665 312,441 335,216 377,118 419,020 3,338 6,475 9,439 12,203 14,780 17,156 19,360 21,362 23,179 24,794 26,874 28,877 30,864 32,727 34,590 36,391 38,036 39,605 41,203 42,632 45,380 47,740 50,348 53,329 56,186 58,933 61,526 64,010 66,168 68,388 70,469 72,440 74,272 75,979 77,300 88,322 97,870 107,216 116,810 125,582 145,765 163,836 179,127 194,172 205,381 216,325 224,895 232,689 256,690 274,374 292,041 306,029 322,113 335,573 361,950 388,342 436,874 485,421 3,711 7,204 10,480 13,554 16,425 19,065 21,503 23,738 25,757 27,557 29,870 32,091 34,295 36,360 38,440 40,443 42,259 44,014 45,784 47,382 50,441 53,050 55,952 59,274 62,442 65,484 68,388 71,136 73,526 75,995 78,308 80,498 82,531 84,441 85,900 98,149 108,768 119,155 129,820 139,555 161,988 182,062 199,062 215,783 228,234 240,405 249,938 258,584 285,256 304,911 324,551 340,091 357,975 372,927 402,238 431,564 485,498 539,448 4,394 8,555 12,482 16,177 19,655 22,884 25,896 28,675 31,236 33,550 36,345 39,046 41,793 44,293 46,699 49,090 51,295 53,515 55,517 57,411 61,044 64,305 67,844 71,804 75,592 79,209 82,640 85,884 88,974 91,862 94,578 97,124 99,484 101,658 103,351 117,897 130,395 142,395 155,018 166,506 192,976 217,226 236,679 255,169 269,856 285,474 294,727 308,125 337,157 359,792 381,807 408,276 421,038 440,181 477,814 510,354 574,146 637,938 5,434 10,588 15,448 20,027 24,328 28,334 32,075 35,506 38,673 41,545 45,008 48,345 51,745 54,850 57,815 60,781 63,513 66,246 68,730 71,090 75,592 79,612 83,990 88,912 93,601 98,072 102,310 106,346 110,150 113,736 117,106 120,242 123,175 125,877 127,957 145,966 161,445 176,287 191,936 206,157 238,930 268,940 293,035 315,934 334,098 353,458 364,916 381,496 417,436 445,474 472,721 505,510 521,298 544,990 591,596 631,884 710,859 789,850 Professional Supervision Fees TL 115 TL For projects with a power of 50 kW and below, the professional supervision fee is applied as 25 TL. Calculation Formula: Project Minimum Wage (PMU) = YYA x BM x MMHK x HDO x HBO x BK x OK (BM) Unit Cost: The costs determined and announced annually by the Ministry of Environment and Urbanization for each class of architectural services (unit is TL/m2). (YYA) Approximate Building Area: The sum of the area obtained by multiplying the seating or usable area of the building or facility by the number of floors, plus the open and closed projection areas requiring engineering services. It is found or obtained from the architectural project of the building or facility. (YYM) Approximate Building Cost: The price that forms the basis for calculating the fees for architectural and engineering services. The value obtained by multiplying the approximate building area by the unit cost (calculated in TL). (HBO) Service Division Ratio: The service ratios within the project services themselves. MMHK = Architectural Engineering Services Coefficient, building approximate area, and service class adjustment coefficient depending on the building classes. The Project Tender Document (PTD) coefficient corresponds to the Engineering and Architecture Services Specification of the Ministry of Environment and Urbanization. (HDO) Service Branch Ratio: This is the ratio of electrical engineering services within the architectural and engineering services of buildings and facilities. This ratio is .5. (BK) Regional Reduction Coefficient: This is the regional reduction coefficient determined by the Chamber's Board of Directors and defined in the previous section. (OK) Chamber Coefficient: This is the coefficient determined by the Chamber's Board of Directors. 6,365 12,389 18,087 23,459 28,489 33,192 37,556 41,592 45,287 48,655 52,708 56,620 60,610 64,242 67,720 71,198 74,381 77,594 80,498 83,261 88,524 93,243 98,366 104,127 109,623 114,854 119,838 124,542 129,013 133,205 137,148 140,828 144,258 147,410 149,863 170,946 189,080 206,468 224,787 241,445 279,823 314,987 343,196 370,023 391,292 413,959 427,372 446,795 488,882 521,733 553,638 592,030 610,536 638,280 692,866 740,046 832,544 7,561 14,734 21,503 27,883 33,876 39,450 44,650 49,448 53,841 57,846 62,659 67,301 72,052 76,368 80,498 84,627 88,430 92,235 95,696 98,972 105,245 110,849 116,934 123,781 130,317 136,543 142,457 148,063 153,356 158,355 163,044 167,422 171,489 175,246 178,150 203,222 224,771 245,450 267,216 287,011 332,655 374,448 407,982 439,870 465,160 492,111 508,056 531,141 581,179 620,224 658,167 703,795 725,794 758,785 823,663 879,740 989,719 925,058 1,099,683 189 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 PART I - IN-BUILDING ELECTRICAL INSTALLATION ENGINEERING SERVICES and MINIMUM FEES FOR TECHNICAL RESPONSIBILITY (TECHNICAL LIABILITY) (TUS) AREA (m²) 1A CLASS 210.00 TL/m² OK=1.13 1B CLASS 310.00 TL/m² OK=1.26 2A CLASS 510.00 TL/m² OK=0.69 2B CLASS 750.00 TL/m² OK=1.00 2C CLASS 820.00 TL/m² OK=1.09 3A CLASS 1,100.00 TL/m² OK=0.86 3B CLASS 1,450.00 TL/m² OK=0.78 4A CLASS 1,550.00 TL/m² OK=0.85 4B CLASS 1.850,00 TL/m² OK=0.83 CLASS 4C 2.000,00 TL/m² OK=0.85 CLASS 5A 2.400,00 TL/m² OK=0.77 CLASS 5B 2.900,00 TL/m² OK=0.79 CLASS 5C 3.250,00 TL/m² OK=0.82 5D CLASS 3.800,00 TL/m² OK=0.84 100 200 300 400 500 600 700 800 900 1.000 1.100 1.200 1.300 1.400 1,500 1,600 1,700 1,800 1,900 2,000 2,200 2,400 2,600 2,800 3,000 3,200 3,400 3,600 3,800 4,000 4,200 4,400 4,600 4,800 5,000 6,000 7,000 8,000 9,000 10,000 12,500 15,000 17,500 20,000 22,500 25,000 27,500 30,000 35,000 40,000 45,000 50,000 55,000 60,000 70,000 80,000 90,000 100,000 252 494 708 904 1,072 1,229 1,370 1,481 1,583 1,658 1,798 1,937 2,068 2,198 2,320 2,441 2,552 2,664 2,776 2,879 3,074 3,242 3,428 3,643 3,838 4,043 4,220 4,406 4,583 4,742 4,909 5,096 5,226 5,375 5,487 6,325 7,070 7,769 8,542 9,269 10,768 12,268 13,535 14,709 15,798 16,739 17,503 18,109 19,394 20,847 21,974 23,316 24,443 25,346 27,656 29,408 33,087 36,767 419 801 1,155 1,472 1,761 2,022 2,245 2,432 2,590 2,720 2,953 3,177 3,391 3,605 3,800 3,997 4,192 4,369 4,546 4,714 5,049 5,309 5,617 5,971 6,288 6,623 6,912 7,219 7,517 7,769 8,048 8,346 8,561 8,803 8,998 10,358 11,588 12,734 14,001 15,202 17,652 20,102 22,198 24,107 25,906 27,433 28,690 29,678 31,792 34,177 36,022 38,229 40,073 41,555 45,337 48,214 54,232 60,259 792 1,528 2,208 2,841 3,409 3,931 4,388 4,798 5,179 5,450 5,924 6,371 6,810 7,219 7,629 8,011 8,384 8,737 9,082 9,408 10,014 10,554 11,159 11,849 12,510 13,153 13,712 14,299 14,867 15,398 15,854 16,339 16,804 17,242 17,578 20,176 22,477 24,713 26,986 29,063 34,056 38,350 42,076 45,960 48,969 51,363 53,990 55,704 60,725 65,130 69,164 73,048 76,169 79,438 86,285 91,306 102,726 114,137 904 1,742 2,515 3,233 3,885 4,471 4,993 5,459 5,897 6,204 6,744 7,257 7,750 8,225 8,681 9,120 9,539 9,949 10,331 10,703 11,393 12,016 12,697 13,479 14,243 14,969 15,603 16,274 16,916 17,531 18,044 18,593 19,124 19,618 20,009 22,971 25,589 28,132 30,712 33,087 38,760 43,650 47,898 52,313 55,732 58,461 61,451 63,398 69,118 74,138 78,730 83,146 86,695 90,421 98,218 103,928 116,922 129,917 1,081 2,078 3,009 3,866 4,639 5,347 5,980 6,530 7,052 7,424 8,077 8,681 9,269 9,836 10,387 10,908 11,420 11,905 12,370 12,808 13,637 14,374 15,202 16,133 17,038 17,913 18,677 19,478 20,242 20,977 21,592 22,254 22,888 23,483 23,939 27,489 30,619 33,664 36,748 39,589 46,380 52,238 57,316 62,597 66,695 69,956 73,532 75,871 82,708 88,716 94,212 99,494 103,750 108,203 117,528 124,374 139,921 155,467 1,258 2,432 3,531 4,555 5,496 6,362 7,145 7,853 8,477 9,026 9,790 10,517 11,225 11,905 12,594 13,219 13,823 14,401 14,960 15,529 16,506 17,373 18,425 19,534 20,540 21,565 22,534 23,474 24,359 25,123 25,915 26,669 27,386 28,048 28,560 32,705 36,329 39,775 43,370 46,883 54,511 61,162 67,161 72,824 77,026 81,767 85,149 88,306 96,159 102,922 108,911 114,472 119,921 125,594 135,841 144,784 162,882 180,982 1,500 2,897 4,210 5,422 6,549 7,573 8,514 9,352 10,097 10,759 11,662 12,538 13,376 14,187 15,007 15,752 16,478 17,168 17,820 18,500 19,664 20,708 21,956 23,279 24,480 25,691 26,855 27,964 29,026 29,929 30,880 31,783 32,631 33,422 34,037 38,974 43,287 47,395 51,680 55,862 64,954 72,881 80,026 86,779 91,781 97,435 101,459 105,232 114,584 122,641 129,786 136,409 142,902 149,665 161,867 172,523 194,087 215,652 1,724 3,353 4,891 6,316 7,648 8,887 10,023 11,066 11,998 12,846 13,916 14,951 15,985 16,945 17,913 18,845 19,702 20,512 21,341 22,076 23,511 24,722 26,073 27,619 29,100 30,516 31,867 33,152 34,270 35,416 36,496 37,512 38,462 39,356 40,036 45,746 50,692 55,527 60,501 65,038 75,489 84,851 92,777 100,565 106,369 112,041 116,485 120,517 132,944 142,100 151,257 158,495 166,832 173,799 187,465 201,130 226,271 251,412 2,003 3,885 5,663 7,322 8,868 10,294 11,616 12,817 13,907 14,876 16,124 17,326 18,518 19,636 20,754 21,835 22,822 23,763 24,722 25,579 27,228 28,644 30,209 31,997 33,712 35,360 36,916 38,406 39,701 41,033 42,281 43,464 44,563 45,587 46,380 52,993 58,722 64,330 70,086 75,349 87,459 98,302 107,476 116,503 123,229 129,795 134,937 139,613 154,014 164,624 175,225 183,617 193,268 201,344 217,170 233,005 262,124 291,253 2,227 4,322 6,288 8,132 9,855 11,439 12,902 14,243 15,454 16,534 17,922 19,255 20,577 21,816 23,064 24,266 25,355 26,408 27,470 28,429 30,265 31,830 33,571 35,564 37,465 39,290 41,033 42,682 44,116 45,597 46,985 48,299 49,519 50,665 51,540 58,889 65,261 71,493 77,892 83,733 97,193 109,237 119,437 129,470 136,940 144,243 149,963 155,150 171,154 182,947 194,731 204,055 214,785 223,756 241,343 258,938 291,299 323,669 2,636 5,133 7,489 9,706 11,793 13,730 15,538 17,205 18,742 20,130 21,807 23,428 25,076 26,576 28,019 29,454 30,777 32,109 33,310 34,447 36,626 38,583 40,706 43,082 45,355 47,525 49,584 51,530 53,384 55,117 56,747 58,274 59,690 60,995 62,011 70,738 78,237 85,437 93,011 99,904 115,786 130,336 142,007 153,101 161,914 171,284 176,836 184,875 202,294 215,875 229,084 244,966 252,623 264,109 286,688 306,212 344,488 382,763 3,260 6,353 9,269 12,016 14,597 17,000 19,245 21,304 23,204 24,927 27,005 29,007 31,047 32,910 34,689 36,469 38,108 39,748 41,238 42,654 45,355 47,767 50,394 53,347 56,161 58,843 61,386 63,808 66,090 68,242 70,264 72,145 73,905 75,526 76,774 87,580 96,867 105,772 115,162 123,694 143,358 161,364 175,821 189,560 200,459 212,075 218,950 228,898 250,462 267,284 283,633 303,306 312,779 326,994 354,958 379,130 426,515 473,910 3,819 7,433 10,852 14,075 17,093 19,915 22,534 24,955 27,172 29,193 31,625 33,972 36,366 38,545 40,632 42,719 44,629 46,556 48,299 49,957 53,114 55,946 59,020 62,476 65,774 68,912 71,903 74,725 77,408 79,923 82,289 84,497 86,555 88,446 89,918 102,568 113,448 123,881 134,872 144,867 167,894 188,992 205,918 222,014 234,775 248,375 256,423 268,077 293,329 313,040 332,183 355,218 366,322 382,968 415,720 444,028 499,526 555,035 4,537 8,840 12,902 16,730 20,326 23,670 26,790 29,669 32,305 34,708 37,595 40,381 43,231 45,821 48,299 50,776 53,058 55,341 57,418 59,383 63,147 66,509 70,160 74,269 78,190 81,926 85,474 88,838 92,014 95,013 97,826 100,453 102,893 105,148 106,890 121,933 134,863 147,270 160,330 172,207 199,593 224,669 244,789 263,922 279,096 295,267 304,834 318,685 348,707 372,134 394,900 422,277 435,476 455,271 494,198 527,844 593,831 659,810 Professional Supervision Fees TL 115 TL For projects with a power of 50 kW and below, the professional supervision fee is applied as 25 TL. Technical implementation responsibility (technical responsibility) services are carried out within the framework of the Turkish Union of Chambers of Engineers and Architects, Chamber of Electrical Engineers Technical Implementation Responsibility Implementation Principles Regulation, which was published in the Official Gazette No. 27652 on July 25, 2010 and entered into force. 190 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 PART II - SEPARATELY DRAWN HIGH CURRENT PROJECTS AND OTHER SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION FEE TL 1 Lightning Protection (TS EN 62305) and Grounding Projects 1.1 Faraday cage, Franklin rod project costs Building perimeter up to 400 m and up to 10 floors For each additional 100 m of building perimeter After 10 floors For each additional floor 1.2 Grounding project costs Buildings with a closed area up to 1000 m² and up to 5 floors For each additional 100 m² after 1000 m² For each additional floor after 5 floors 2. HV/LV Distribution Line Project Costs 2.1 LV pole lines: Fixed cost up to 500 m. Additional cost for each additional m. 2.2 Underground cable lines/Building connection lines/Special switch projects: Fixed cost up to 100 m. Additional cost for each additional m. 2.3 HV/LV shared pole line project costs: Fixed cost up to 500 m. Additional cost for each additional m. 3. Irrigation Motor and Construction Site Projects (Excluding Distribution Line) Costs: Up to 10 kW. Additional cost for each kW exceeding 10 kW. 4. Highway and Bridge Lighting Project Costs: Fixed cost up to one external panel. Additional cost per m for each additional external panel. 5. Tunnel Lighting Project Costs: Fixed cost up to one external panel. Additional cost per m for each additional external panel. 6. Street Lighting Project Costs: Fixed cost up to one external panel. Additional cost per m for each additional external panel. 7. Street Lighting Project Costs Fixed cost up to one external type panel. 8 9 per m for each additional external type panel. Stadium Lighting Project Costs Fixed cost Cathodic Protection Project Costs Cathodic protection rectifier Cathodic protection per m of pipelines Cathodic protection per tank 1,739 78 39 1,794 186 46 2,391 1.73 2,079 1.5 3,695 2.79 451 31 2,391 1,196 5.59 11,954 1,196 6.06 2,391 1,196 1.86 2,391 1,196 1.86 167,360 2,391 6.06 2,391 115 115 115 115 115 115 115 115 115 115 115 191 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 PART II - SEPARATELY DRAWN POWER CURRENT PROJECTS AND OTHER SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED 10 Elevator and Escalator Project Costs COST TL INSPECTION FEE TL 115 115 115 Food elevators Small passenger elevators (320-630 kg) Medium passenger elevators (631-1600 kg) Large passenger elevators (over 1600 kg) Patient elevators Freight elevators Elevators for physically disabled people Elevators requiring special calculations Escalator (for each independent unit) 1,521 3,043 3,695 4,347 5,216 5,216 6,086 8,911 5,216 Note: * A separate professional supervision fee is applied for elevator installation projects, even if they are within the same building group. 11. High Voltage Pumping Station Project Costs Up to 200 kW 400 kW 600 kW 800 kW 1,000 kW 1,500 kW 2,000 kW 12. Industrial Buildings (Power Project Costs) Up to 5 kW 10 kW 20 kW 30 kW 40 kW 50 kW 100 kW 200 kW 300 kW 400 kW 500 kW 1,000 kW 2,000 kW 3,000 kW 11,954 15,432 17,932 21,735 23,909 31,516 47,817 1,196 1,739 2,174 2,608 3,260 3,804 6,521 12,107 15.215 18.909 21.735 30.429 56.511 73.899 Notes: * Interior lighting project and TUS (Technical Supervision) fees are charged separately according to the relevant building class. * If interior projects and power projects are drawn together, a discount of is applied to the total cost. * Reduction coefficients are applied in calculating the power project cost. * The application is the value obtained by multiplying the reduction coefficient, which is obtained by dividing the total motor power by the total number of motors, by the power project cost. * Compensation project fees are included in the above costs. * Projects transitioning from construction site to industrial are considered industrial building projects. 192 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 PART II - SEPARATELY DRAWN POWER PROJECTS AND OTHER SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION FEE TL 12.1 Motor Power Reduction Coefficients For motor power up to 0-5 kW For motor power up to 5-10 kW For motor power up to 10-15 kW For motor power up to 15-20 kW For motor power up to 20-30 kW For motor power up to 30-50 kW For motors over 50 kW 13 Small industrial site projects 13.1 Small industrial site LV distribution project costs Up to 30 units 50 units 100 units 150 units 200 units 300 units 500 units 1,000 units 1,500 units 2,000 units 14 Illuminated Advertising Panel Projects Up to 5 m² 10 m² 15 m² 20 m² 30 m² 40 m² 50 m² 15 Outdoor Lighting, Parks, Gardens, Open Areas etc. Lighting Project Costs Up to 500 m² 1,000 m² 2,000 m² 3,000 m² 5,000 m² 10,000 m² 20,000 m² 50,000 m² 100,000 m² For each additional m² after 100,000 m² 1 0.9 0.8 0.7 0.6 0.5 0.4 4,891 7,173 9,563 14,780 19,562 26,082 41,297 78,246 110,849 143,451 1,553 2,391 3,152 3,587 4,347 5,216 6,303 1,428 1,794 3,587 4,347 6,738 9,129 11,954 23,909 41,297 0.32 115 115 115 193 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART II - SEPARATELY DRAWN POWER CURRENT PROJECTS AND OTHER SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION FEE TL 16 Building, Apartment, Business Center Perimeter/Facade Lighting Projects Fees 115 115 115 115 115 1,242 2,283 5,651 2,608 8.26 167,360 4.35 41,297 3.47 886 1,304 1,755 2,283 3,587 4,130 5,000 6,086 7,955 7,825 8,694 9,129 Up to 10 points with pole or ground lamp Up to 20 points with pole or ground lamp Up to 50 points with pole or ground lamp 17 Pool Electrical Project Costs Up to 100 m² For each additional m² 18 Airport Runway and Taxiway Lighting Project Costs Up to 10,000 m² For each additional m² 19 Airport Apron Lighting Project Costs Up to 5,000 m² For each additional m² 20 Compensation Projects Up to 25 kVAr 50 kVAr 75 kVAr 100 kVAr 150 kVAr 200 kVAr 300 kVAr 400 kVAr 500 kVAr 600 kVAr 800 kVAr 1,000 kVAr Notes: * Study and justification report are not included in the stated fee. * Measurements taken at the facility will be indicated in the necessary calculations. * Selection of capacitor steps will be specified in the project. * Material selection table will be specified. * Connection diagram and single-line diagram will be specified. * Control panel will be indicated in the single-line diagram. * Summary of estimates will be specified. * Other engineering services are excluded from the prices. 194 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 PART III - 36 kV POWER TRANSMISSION LINES (PTL) and TRANSFORMER SUBSTATIONS (TSS) PROJECTS and OTHER SERVICES (OPERATIONAL RESPONSIBILITY-MAINTENANCE-CONSULTING SERVICES) ORDER NO. NAME OF SERVICE TO BE PERFORMED PRICE TL INSPECTION FEE TL 1 1.1 1.2 PTL Survey and Application Projects Prices Fixed price up to 1000 m 16 mm² copper or SWALLOW 3 AWG with 25 mm² copper or RAVEN 1/0 AWG with 35 mm² copper or PIGEON 3/0 AWG with PATRIDGE For high-voltage underground cables with HAWK 477 MCM and 266.8 MCM, the following charges apply for each meter exceeding 1000 m: 16 mm² copper with SWALLOW 3 AWG, 25 mm² copper with RAVEN 1/0 AWG, 35 mm² copper with RAVEN 1/0 AWG, or PIGEON 3/0 AWG. Notes: * Topographic services are not included in the above charges. * The cost is not considered if the cable length is less than 80 m. * is added to the above charges for each additional circuit. * A discount of is applied to high-voltage underground cable projects for agricultural irrigation purposes. 2. Transformer Substation Implementation Project Costs 2.1 Pole-mounted transformers 2.2 Building-type two-cell transformer substations Up to 160 kVA 400 kVA For each kVA exceeding 400 kVA For each additional cell Per secondary protected feeder If power exceeds 5 MVA For each kVA exceeding 5 MVA Building connection line projects 2.3 Self-producer network connection conversion projects (per feeder) 7,468 8,073 9,284 12,716 15,541 1,917 3.83 5.85 7.06 10.10 12.72 1.01 8,188 10,899 15,339 4.65 1,211 2,018 2.43 3,028 5,247 Notes: * Discounts up to are applied to modification projects; conversion projects from pole-mounted substations to building-mounted substations are not included in the modification project scope. * If there is more than one transformer substation in the project, the total power will be taken as the basis. * In the construction of transformer building projects, the relevant chamber unit prices will be used as the basis. * In KÖK and DM projects, double the amount in the "each increasing cell" section will be charged for changing values. * In external systems, the steel structure project will be calculated separately using the relevant chamber unit price. * Calculations, drawings, material specification lists, market research, etc., requested by the Ministry of Energy and Natural Resources or the administrations it authorizes will be priced separately. * The secondary protection project specified in the table will be prepared showing all types of relay connections and including the terminal connection plan. * No fee will be charged if secondary protection is not provided. * No overhead power line (ENH) project fee will be charged if the distance between the branch pole and the sectionalizer pole is a maximum of 30 m, and the distance between the sectionalizer and the transformer pole or transformer building is a maximum of 50 m, and the terrain does not require any topographical studies. * The compensation application project is included in the above fees. * The transformer substation project will end with the showing of the LV distribution (main panel) outputs (including the output switch and/or output fuses, the cross-section and length of the output cables, and specifying where each output feeds). * All necessary short-circuit, LV and HV voltage drop calculations, and HV energy loss calculations are included in the stated fee. * Transformer pole peak force calculation is included in the defined fee. * If the cells are metal-enclosed modular HV cells, half of the minimum fee will be applied for each additional cell. * In transformer substation and ENH projects designed together, a single professional supervision fee will be charged. Example: The project cost for a facility with three building-type transformer substations – one with 4 cells and secondary protection at 630 kVA, one with 3 cells at 400 kVA, and one with 2 cells at 400 kVA – is calculated as follows. Total kVA = 630+400+400 = 1,430 kVA Total number of cells = 4+3+2 = 9 For the first 400 kVA: 15,339 TL For the remaining 1030 kVA: 1030 x 4.65 = 4789 TL Cost for the remaining number of cells: (9-2) = 7 cells = 7 x 1211 = 8477 TL Secondary protection: 2018 TL Total project cost: 30,623 TL 115 115 115 115 115 195 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART III - 36 kV POWER TRANSMISSION LINES (PTL) and TRANSFORMER SUBSTATIONS (TS) PROJECTS and OTHER SERVICES (OPERATIONAL RESPONSIBILITY - MAINTENANCE - CONSULTING SERVICES) SERIAL NO. NAME OF SERVICE TO BE PERFORMED 3 HV Facilities Engineering Services 3.1 For pole-mounted transformers: Monthly maintenance service Monthly consulting service Monthly operational responsibility up to 0-50 kVA Monthly operational responsibility between 51-160 kVA Monthly operational responsibility between 161-400 kVA 3.2 For building-type transformer substations: Monthly maintenance service up to 400 kVA and 2 cells Monthly operational responsibility up to 400 kVA and 2 cells Monthly consulting services up to 400 kVA and 2 cells Monthly maintenance service for each additional kVA from 401 kVA to 5 MVA Monthly maintenance service for each additional kVA from 5 MVA to 401 kVA to 5 MVA Monthly operational responsibility for each additional kVA from 5 MVA to 5 MVA Monthly consulting services for each KVA increasing from 401 kVA to 5 MVA; Monthly consulting services for each KVA increasing after 5 MVA; Monthly maintenance service for each feeder with load disconnect switch; Monthly operational responsibility for each feeder with load disconnect switch; Monthly consulting service for each feeder with load disconnect switch; Monthly maintenance service for each feeder with secondary protection; Monthly operational responsibility for each feeder with secondary protection; Monthly consulting service for each feeder with secondary protection; 3.3 HV operational responsibility services up to 500 meters; For each additional meter. Notes: * If the distance traveled from the center (round trip) exceeds 10 km, a fee of 0.3 liters of super gasoline per km will be charged. * If both services are performed by the same person, a discount of will be applied to the total cost. * Printed documents provided by the chamber will be used in the contracts. * If there is more than one transformer in the same facility, the transaction will be based on the total power. * If all transformers are pole-mounted, the second and subsequent transformers are calculated based on the increased power. * If the transformers are both building-type and pole-mounted, provided they are supplied from the same overhead power line, the pole-type transformers are calculated based on the increased power. * Building-type transformers up to 399 kVA are evaluated as if they were pole-mounted transformers. * Electricity generation operation responsibility services are calculated based on building-type transformer power and charges. 3.4 Transformer certificate acquisition service fee 3.5 Site survey report acquisition fee 3.6 Energy permit acquisition service fee 4 Low Voltage (LV) Installation Engineering Services Monthly maintenance service for LV installations up to 50 kVA Monthly operational responsibility for LV installations up to 50 kVA Monthly consulting services for LV installations up to 50 kVA Monthly maintenance service for each additional kVA Monthly operational responsibility for each additional kVA Monthly consulting services for each additional kVA 5 Energy Management Services 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1.7 5.1.8 Commercial and Service Buildings Monthly energy management service for annual energy consumption up to 250 TEP Commercial and Service Buildings Monthly energy management service for each additional TEP after 250 TEP Commercial and Service Buildings Monthly energy management service for buildings with a building area up to 10,000 m2 Commercial and Service Buildings Monthly energy management service for buildings with a building area increasing from 10,001 to 20,000 m² (Commercial and Service Buildings) Monthly energy management service for buildings with a building area increasing from 20,001 to 40,000 m² (Commercial and Service Buildings) Monthly energy management service for buildings with a building area exceeding 40,001 m² (Commercial and Service Buildings) Monthly energy management service for industrial enterprises with an annual energy consumption of 1000 TEB (Tunnel Equivalent Petroleum) Monthly energy management service for each additional TEB (Tunnel Equivalent Petroleum) exceeding 1000 TEB (Industrial Enterprises) 5.2 Energy Performance Certificate Issuance Service Up to 100 m² For existing buildings, for each additional m² exceeding 100 m² For new buildings, for each additional m² exceeding 100 m² PRICE TL INSPECTION FEE (Per Contract) TL 330 330 330 420 575 575 750 575 0.45 0.36 0.45 0.36 0.45 0.36 45 100 55 30 115 60 220 0.14 1000 6,000 5,000 750 500 750 3 3 3 2500 2 2500 0.15 0.10 0.05 7500 1.5 200 1.82 1.00 115 115 115 115 115 115 115 *If there is no annual energy consumption value for buildings, the Building Area is used. If there is an energy consumption value, the building area is not considered. If both values are available, the TEP value is used. TEP (Ton Equivalent of Petroleum) 196 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART IV - LOW VOLTAGE DISTRIBUTION AND LIGHTING PROJECTS AND OTHER SERVICES IN RESIDENTIAL AREAS ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION FEE TL 1 Low Voltage Distribution and Environmental Lighting Application Projects for Residential Areas and Holiday Resorts Including Private Supply Lines 10 independent units 20 independent units 30 independent units 60 independent units 90 independent units 150 independent units 300 independent units 600 independent units 900 independent units 1,500 independent units 3,000 independent units 6,000 independent units Number of units in the building For 2-5 units For 6-9 units For 10-30 units For 31-50 units: 3,043 For 51 units and above: 6,086 8,911 11,737 16,736 21,735 45,644 65,205 119,543 167,360 260,820 391,230 115 Reduction Factor 0.6 0.5 0.4 0.3 0.2 Notes: * The above prices are given for single-unit residences. A reduction factor is applied for multi-unit residences. * The minimum costs for the site lighting project are included in the above prices. 2 Organized Industrial Zones HV Distribution and On-Site Lighting Application Project Costs Fixed cost for study, feasibility and project for 1000 kVA installed power: 11,085 For each additional kVA For each pole For each m of long-span overhead line For each m of HV underground cables For a 2-cell transformer building For a pole-type transformer For the number of LV field distribution boxes For the number of cells in the transformer substation For each m of LV unit connection/street lighting: 11.00 26.00 3.70 0.50 1,300 650 310 310 0.35 115 197 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART V - TEST and MEASUREMENT SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION FEE TL 1 Low Voltage Installation Inspection Fees (Up to 500 m2) (Visual Inspection) 1st class buildings installation inspection For each m2 exceeding 500 m2 2nd class buildings installation inspection For each m2 exceeding 500 m2 3rd class buildings installation inspection For each m2 exceeding 500 m2 4th class buildings installation inspection For each m2 exceeding 500 m2 5th class buildings installation inspection For each m2 exceeding 500 m2 2 Grounding-Loop/Line Impedance-Continuity Measurement Fees Fixed fee for up to 3 measurements in HV installations For each additional measurement* Fixed fee for up to 3 measurements in LV installations For each additional measurement* (Up to 50 points) For each additional measurement* (After 51 points) 3 Secondary Relay Test Fees Fixed fee for 1 measurement For each additional measurement 4 Transformer Oil Dielectric Strength Test Fixed fee for 1 measurement if sample is taken Fixed fee for 1 measurement if sample is brought 5 Energy Analysis (Harmonic) Measurement Fees Fixed fee for a substation with 1 transformer For each additional measurement 6 Insulation Resistance Measurement Fees Fixed fee for up to 3 measurements For each additional measurement 7 Cathodic Protection Measurement Fees Fixed fee for 1 measurement For each additional measurement 8 Soil Residual Resistance Measurement Fees Fixed fee for up to 3 measurements For each additional measurement 9 Residual Current Switch Test Fees Fixed fee for up to 3 measurements For each additional measurement 10 Illumination Level Measurement Fees Fixed fee for up to 3 measurements For each additional measurement 198 500 0.55 830 0.58 1490 0.60 2.236 0.65 3.643 0.67 900 55 600 35 25 2,000 500 600 200 2,500 1,500 1,000 50 800 50 900 50 600 20 600 20 50 50 50 50 50 50 50 50 50 50 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART V - INSPECTION AND MEASUREMENT SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED 11 Lightning Protection Installation Control Fee Fixed fee for 1 installation For each additional installation 12 Noise Level Measurement Fees Fixed fee for up to 3 measurements For each additional measurement 13 Measurement with Thermal Camera Electromagnetic Field Level Measurement Fees: Fixed fee for up to 3 measurements. For each additional measurement: 14. High frequency: Fixed fee for up to 3 measurements (base station). For each additional measurement: 15. Low frequency: Fixed fee for up to 3 measurements (Transformer - HV, etc.). For each additional measurement: 15. Generator Periodic Inspection Fees: 100 kVA DC periodic inspection, 200 kVA DC periodic inspection, 400 kVA DC application projects. For each kVA exceeding 400 kVA. For each kVA exceeding 5 MVA: 16. Fire Detection and Warning System Inspection Fee: Per unit, per detector, per siren/flasher. FEE TL INSPECTION FEE TL 900 450 540 14 900 55 2,000 345 940 150 1,220 2,265 3.080 2.00 0.60 200 20 20 50 50 50 50 50 50 To the above prices, of the electrical installation visual inspection fee is added, depending on the building area being inspected. Notes: * A discount of may be applied to the LV Grounding Measurement Fee for single-point measurements made for LV subscriptions and natural gas subscriptions/periodic inspections. * of the fees is applied for repeated measurement and inspection services. * The travel, food, and accommodation expenses of the person performing the measurement are the responsibility of the person or organization requesting the measurement. * A Test Measurement Discovery Fee of 690 TL is charged. In addition to visual inspection, the following tests are performed at the facility for requests for Electrical Installation Inspection to ensure compliance with the TS HD 60364 standard: 1- Continuity of conductors 2- Insulation resistance 3- Insulation resistance (effectiveness of protection with SELV, PELV or electrical isolation) 4- Insulation resistance (effectiveness of resistance-impedance of floor and walls) 5- Polarity 6- Effectiveness of automatic power cut-off 7- Effectiveness of additional protection 8- Phase sequence 9- Functional tests 10- Voltage drop. Within this scope, evaluation should be made according to the relevant articles of the TS HD 60364 standard regarding the following aspects. 1- Method of protection against electric shock – 60364-4-41 2- Fire barriers and other fire protection measures, protection against thermal effects 60364-4-42, 60364-5-52, 527 3- Selection of conductors according to current carrying capacity, 60364-5-52, 523 4- Selection, adjustment, selectivity and coordination of protection and monitoring devices, 60364-5-53, 536 5- Selection, placement and installation of high voltage protection devices (HVPDs), 60364-5-53, 534 6- Selection, placement and installation of insulation and switching devices, 60364-5-53, 536 7- Selection of appropriate equipment and protection measures against external influences and mechanical stresses, 60364-4-42, 422, 60364-5-51 8- Determination of neutral and protective conductors, 60364-5-51, 514.3 9- Presence of diagrams and warning notes, 60364-5-51, 514.5 10- Determination of circuits, overcurrent protection devices, switches, etc., 60364-5-51, 514 11- Adequacy of cable and conductor connections and terminations, 60364-5-52, 526 12- Selection and installation of grounding devices, protective conductors and connections, 60364-5-54 13- Equipment access for operation and maintenance, 60364-5-51, 513 and 514 14- Precautions against electromagnetic interference, 60364-5-4-44, 444 15- Connection of conductive parts exposed to voltage to grounding devices, 60364-4-41, 411 16- Selection and installation of cabling, 60364-5-52, 521 and 522 199 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART VI- PROJECTS AND OTHER SERVICES COMMISSIONED BY ELECTRICITY DISTRIBUTION ORGANIZATIONS ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION FEE TL 1 Preparation of City Network Study Report Fixed Fees 1.1 HV-LV network or only HV network fees In villages with up to 1,000 inhabitants In villages with more than 1,000 inhabitants Fixed Costs in Project Planning 2.1 HV-LV network implementation project costs In all villages regardless of population In cities and towns up to 10,000 population In cities and towns up to 20,000 population In cities and towns up to 30,000 population In cities and towns with a population of up to 40,000; in cities and towns with a population of up to 50,000; in cities and towns with a population of up to 60,000; in cities and towns with a population of up to 75,000; in cities and towns with a population of 75,001-100,000, an additional fee of 2.2 is charged for every 50,000 inhabitants after the first 100,000 inhabitants. In all villages regardless of population, in cities and towns with a population of up to 10,000; in cities and towns with a population of up to 20,000; in cities and towns with a population of up to 30,000; in cities and towns with a population of up to 40,000; in cities and towns with a population of up to 50,000; in cities and towns with a population of up to 60,000; in cities and towns with a population of 75,001-100,000, an additional fee is charged for every 50,000 inhabitants after the first 100,000 inhabitants. Additional fee for a population of 50,000: 200 2,390 3,587 5,217 7,173 12,607 21,735 31,516 49,990 74,986 123,890 18,475 1800 545 7,608 10,868 16,736 21,518 28,256 39,123 60,858 21,735 13,040 3,695 5,434 7,825 11,737 15,215 19,997 43,470 15,215 115 115 115 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB ELECTRICAL CHAMBER OF ENGINEERS 2020 YEAR PART VI - PROJECTS AND OTHER SERVICES COMMISSIONED BY ELECTRICITY DISTRIBUTION ORGANIZATIONS ORDER NO. NAME OF SERVICE TO BE PERFORMED COST TL INSPECTION FEE TL 3 Variable Costs in Project Design 3.1 For each pole required as a result of the project (including those whose location has changed) 3.2 Lighting poles (units) 3.3 Low voltage distribution boxes (LDB) (units) 3.4 For each km of the parts of the LV network fed by underground cable 3.5 HV underground cables For each km of HV cables laid between transformers 3.6 Transformer substation (TM) project costs (including transformers remaining in place) a) For each power plant b) For each cabinet-type transformer substation c) For each cabinet-type special transformer substation d) For each pole-type transformer substation e) f) For each pole-type special transformer substation, g) For each 30/15-10.5-6.3 kV step-down substation, h) For each distribution center, Costs of Power Plants and Transformers Other Than Type 4, %7 of the complete project cost estimate, including the specifications for the cabinet to be designed as a new and modified project. 5 Special Type Steel Poles 5.1 New HV pole of all types 5.2 Modifications made to approved poles of all types 5.3 Special foundation calculation (for each type) 6 Mapping Services Fees 6.1 Preparation of tacheometric map and submission in the tacheometric book 6.2 Preparation of unobstructed and elevation-free map with plancote or theodolite 13 8 13 327 171 1.584 963 389 482 171 7.00 2.390 2.390 606 606 482 280 Notes: * The above fees are for each km of the network shown in the maps prepared to cover the electrical project. * If the prepared maps are less than of the existing map of the region where the electrical project will be carried out, no fee will be charged. If it is more than , only the excess amount will be charged. 7. Compensation Project Costs 7.1 Study Preparation Fixed cost for study Measurement cost for each transformer Fixed cost for study report Variable cost for each transformer study report 7.2 Project Construction Cost for each different panel type for automatic compensation Project cost for each transformer in the group for automatic compensation panel Cost for each different panel type for fixed compensation panel Project cost for each transformer in the group for fixed compensation 8. HV Distribution Line Project Works 8.1 HV distribution line study a) Flat terrain study cost (km) b) Hilly terrain study cost (km) 8.2 HV distribution line project construction cost (km) HV distribution line pole application construction cost (km) 1,366 100 848 40 1,150 72 870 50 2,390 4,350 607 1,507 115 115 115 115 115 115 201 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART VII - HIGH LINE AND TRAFFIC SUBSTATION STUDIES AND PROJECTS CARRIED OUT BY ELECTRIC TRANSMISSION ORGANIZATIONS AND GENERATION COMPANIES ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION FEE TL 1 477 MCM, 2x477 MCM, 795 MCM, 2x795 MCM, 954 MCM, 2x1272 MCM Application Project Costs of 154 kV High Lines Carried Out with ACSR 477 MCM, 2x477 MCM, 795 MCM, 2x795 MCM, 954 MCM, The cost of a feasibility study report per km for 154 kV overhead power lines constructed with 2x1.272 MCM ACSR is 7,825. The project cost per km for 154 kV overhead power lines constructed with 795 MCM, 2x795 MCM, 954 MCM, and 2x1.272 MCM AC conductors is 1,272 MCM. The project cost per km for 154 kV overhead power lines constructed with 954 MCM, 1,272 MCM, and 2026 mm² ACSR conductors is 2. The cost of a feasibility study report per km for 380 kV overhead power lines constructed with 954 MCM, 1,272 MCM, and 2,026 mm² ACSR conductors is 2.026 MCM. The project cost per km for 380 kV overhead power lines constructed with 954 MCM, 1,272 MCM, and 2,026 mm² ACSR conductors is 2.026 MCM. 3. Underground Cable Transmission Lines (HCLs): 154 kV 3x1,000 mm² XLPE cable HCL per meter study cost; 154 kV 3x630 mm² XLPE cable HCL per meter study cost; 154 kV 3x1,000 mm² XLPE cable HCL per meter project cost; 154 kV 3x630 mm² XLPE cable HCL per meter project cost. 4. 30 kV and Below Transformer Stations (TMs): 30/15.8 kV power transformer study report cost; 30/15.8 kV 150 MVA power transformer project cost fixed; 30/15.8 kV power transformer project cost for each MVA exceeding 150 MVA fixed; 30/15.8 kV transfer transformer feeder project cost fixed. Fixed cost for 30/15.8 kV transfer feeder project; Fixed cost for 30/15.8-6.3 kV output feeder project; 5 fixed cost for 154 kV TMs; 154/35.5 - 15.8-6.3 kV power transformer study report cost; Fixed cost for 154/35.5 - 15.8-6.3 kV 150 MVA power transformer project; Project cost for each MVA exceeding 150 MVA; Fixed project cost for 154 kV transfer feeder; Fixed project cost for 154 kV coupling feeder; Fixed project cost for 154 kV transfer transformer feeder; Fixed project cost for 154 kV transfer output feeder; Fixed project cost for 154 kV transfer reactor and feeder. 202 3.695 3.478 7.560 3.024 0.66 0.55 0.66 0.55 4.347 4.347 55 4.347 4.347 4.347 8.477 8.477 55 5.000 5.000 5.000 5.000 5.000 115 115 115 115 115 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART VII - HIGH LINE AND SUBSTATION STUDIES AND PROJECTS CARRIED OUT BY ELECTRICITY TRANSMISSION ORGANIZATIONS AND GENERATION COMPANIES ORDER NO. NAME OF SERVICE TO BE PERFORMED FEE TL INSPECTION PRICE IN TL 6 380 kV TMs 380/154 kV power transformer study report cost 380/154 kV 250 MVA power transformer fixed project cost Project cost for each MVA increasing after 250 MVA 380 kV 2 main busbar + transfer busbar output feeder fixed project cost 380 kV 2 main busbar + transfer busbar transfer feeder fixed project cost 380 kV coupling feeder fixed project cost 380 kV transfer + coupling feeder fixed project cost 380 kV main busbar and transfer busbar transformer feeder fixed project cost 380 kV transfer output feeder fixed project cost 380 kV transfer transformer feeder fixed project cost 380 kV shunt reactor and feeder fixed project cost 380 kV series capacitor and feeder fixed project cost 7 Auxiliary Services Transformer Substation (TSS) 15 - 30/0.4 kV TSS feasibility report cost 15 - 30/0.4 kV 500 kVA TSS fixed project cost 15 - 30/0.4 kV TSS project cost for each kVA exceeding 500 kVA 8 Gas Insulated Transformer Substations (GIS) 154 kV GIS Substation feasibility report cost 154 kV 50 MVA GIS Substation fixed project cost 154 kV GIS Substation project cost for each kVA exceeding 50 MVA in GIS Substations transformer feeder fixed project cost in GIS Substations line feeder fixed project cost in GIS Substations coupling feeder fixed project cost in 15 kV GIS Substation metalclad feeder fixed project cost 16.953 16.953 54 16.953 16.953 16.953 16.953 16.953 16.953 16.953 16.953 16.953 4.240 4.240 0.04 4.240 4.240 0.03 4.240 4.240 4.240 4.240 115 115 115 203 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART VIII- ELECTRIC POWER GENERATION PLANTS ELECTRICAL PROJECTS ORDER NO. NAME OF SERVICE TO BE PERFORMED 1 Thermal Power Plant Electrical Application Projects PRICE TL INSPECTION FEE TL Fixed fee up to 2 MW 5 MW Self-Producer 10 MW Self-Producer 15 MW Self-Producer 25 MW Self-Producer Project cost for each kW exceeding 25 MW 2 Hydroelectric Power Plant Electricity Application Projects Up to 0.5 MVA fixed fee 2 MW 10 MW 20 MW 40 MW 60 MW 80 MW 100 MW For each kW exceeding 100 MW 3 Wind, Solar, Bioenergy, Geothermal Power Plant Electricity Application Projects Up to 2 MW fixed fee For each kW exceeding 2 MW 4 Unlicensed Electricity Generation Application Projects Up to 10 kW Unlicensed Electricity Generation Application Projects For each kW exceeding Note: *Grid connection project costs are not included in this price. *Other engineering services are not included in the prices. 71.726 106.502 156.492 239.085 336.893 10 11.954 65.205 293.423 478.170 652.050 891.135 1.130.220 1.260.630 10 54.338 10.35 2.826 26.00 115 115 115 115 204 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART IX - SEPARATELY PERFORMED LOW CURRENT PROJECTS AND OTHER SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED 1 Telephone and Cable TV/R Distribution Centers Implementation Projects Fixed local telephone exchange and distribution center Fixed cable TV/R distribution center Center capable of receiving up to 10 satellite and local broadcasts For each additional channel PRICE TL INSPECTION FEE TL 3,695 3,695 3,695 71 115 Notes: * For city center telephone distribution projects and site-internal telephone distribution projects; of the equivalent LV distribution project cost is applied while maintaining the scope. * For city center cable TV/R and satellite/local broadcast distribution and site-internal cable TV/R distribution: of the equivalent LV distribution project cost is applied while maintaining the scope. 2 Site-Internal Fire Alarm and Warning Systems Implementation Projects Central monitoring/warning unit 3,695 115 Note: * For site-internal fire alarm and warning systems; of the equivalent LV distribution project cost is applied while maintaining the scope. 3.695 3.50 3.695 2.83 3 Tunnel Monitoring/Control Implementation Projects Fixed fee for each entry/exit monitoring and control center Variable fee per m of tunnel 4 5 Highway Entry/Exit Control and Tolling System Implementation Projects Costs Fixed fee for each entry/exit monitoring and control center Variable fee per m of highway Intersection Signaling and Central Monitoring/Control Systems Implementation Projects Costs Fixed fee for central monitoring unit For each intersection Underground cable project required for monitoring per m 6 Perimeter Security and Closed Circuit Television Systems Implementation Projects Costs Central monitoring unit 870 12 0.58 6.237 Note: * Perimeter security distribution systems; provided the scope remains the same, of the equivalent LV distribution project cost applies. 7. Satellite Communication Systems Implementation Project Costs: Fixed center up to 10 channels; For each additional channel. 8. Radar Center Implementation Project Costs: Fixed cost up to 10 channels; For each additional channel. 9. TV/R Transmitter and Relayer Implementation Project Costs: Fixed center; For each relay center. 10. High Voltage Line and Transformer Substation SCADA Systems Implementation Project Costs: Fixed center; For each transformer; For each step-down substation; For each meter of the monitored line. 11. Open Area Public Address Implementation Project Costs: Fixed center; Up to 1,000 m² area; For each additional m² after 1,000 m². 11,955 155 11,955 156 11,955 155 3,478 435 435 0.10 3,478 3,043 1.30 115 115 115 115 115 115 115 115 125 205 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2020 YEAR PART IX - SEPARATELY PERFORMED LOW CURRENT PROJECTS AND OTHER SERVICES ORDER NO. NAME OF SERVICE TO BE PERFORMED 12 Stadium Sound System Application Project Costs COST TL INSPECTION FEE TL Stadium sound system 34,776 115 13 Parking Lot Entrance Control and Fee Application Project Costs Main center For each additional secondary entrance/exit center 14 Intercity Underground Telephone Network Application Project Costs Fixed fee For each m of line length 15 Data Distribution and Structural Cabling Application Project Costs Fixed fee up to 100 data points Fixed fee for up to 100 combined data/telephone points. For every additional 8 points: 2,390 980 5,000 0.44 6,955 6,956 35 115 115 115 206 TMMOB Chamber of Electrical Engineers ___________________________________________________________________ TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2020 YEAR PART X- LV GENERATOR APPLICATION PROJECTS ORDER NO. NAME OF SERVICE TO BE PERFORMED 100 kVA DC application projects 200 kVA DC application projects 400 kVA DC application projects For each kVA exceeding 400 kVA For each kVA exceeding 5 MVA Notes: * If there is more than one DC connection in the facility, the total power is taken as the basis. * Automatic transfer panel design is included in the minimum fees. PRICE TL INSPECTION FEE TL 4,130 7,825 10,650 7.18 2.17 115 207 _____________________________________________________Electrical, Electronic-Biomedical-Control Engineering Services The EMO Board of Directors is authorized to determine the minimum fees for projects and services not specified in the minimum fee definitions. TMMOB CHAMBER OF ELECTRICAL ENGINEERS 2021 YEAR PART XI - OTHER PROJECTS AND SERVICES 208 TMMOB Chamber of Electrical Engineers ___________________________________________________________________

View the original PDF document.

Other Topics