Elevated mobile work platforms (MEWP / manlift / aerial platform), These are the most commonly used pieces of equipment for working at height. Because they carry risks of tipping, falling from the basket, and entrapment, they are subject to the Work Equipment Regulations. Periodic inspection is mandatory.. AES Innovation, MEWP examinations with our authorized engineers It operates according to the relevant standards.

Short answer: MEWP periodic inspection is an examination of chassis stability, lifting/scissor/boom system, hydraulics, emergency lowering and fall prevention equipment for safe operation. Legally at most once every 12 months This is done to prevent accidents involving tipping over and falls from heights.

What is MEWP (Manlift) Periodic Inspection?

This is a regular inspection of scissor lifts, articulated/telescopic boom lifts, aerial lifts, and mast lifts to ensure structural integrity, stability, and safety systems. All MEWP types used in construction, maintenance, warehousing, and plant operations are covered.

Why is it mandatory?

  • Legal requirement: The Work Equipment Regulation (Annex III) mandates periodic inspections of lifting/conveying equipment.
  • Risk of working at height: Tipping over and falling from the basket are the main dangers that can result in death.
  • Operational safety: Verifying that the emergency landing and stabilization systems are functioning is critical.
  • Inspection and insurance: A valid inspection report is required for inspection and rental processes.

Scope of Inspection

  • Chassis and stability: Outrigger/footrest, tilt sensor and tip-over protection.
  • Lifting system: Scissors, boom, mast, hydraulic cylinder and leakage
  • Emergency download: Manual/emergency download function in case of power loss.
  • Basket (platform): Handrail, door, seatbelt attachment points
  • Control and safety: Deadman button, overload warning.
  • Structural elements: Weld, joint and pin wear

Technical Criteria and Inspection Intervals (TS EN 280 / ISO 18893)

Control / criteriaBasisRest
Periodic inspection intervalMaximum 12 months (more frequent with intensive use)Work Equipment Regulations, Annex III
Stability (tipping) and load testingStability at rated load and overload testing.TS EN 280
Emergency download systemThe manual/emergency download function should work in case of power loss.TS EN 280
Fall preventionHandrail, door and seatbelt attachment pointsISO 18893
The values are summarized based on TS EN 280 and ISO 18893; the final criteria are determined according to platform type, manufacturer, and usage intensity.

AES Innovation Inspection Process

  1. Preliminary: Platform information, capacity, and previous reports are reviewed.
  2. Visual examination: The chassis, lifting system, hydraulics, and basket are inspected.
  3. Function test: Lifting, emergency lowering, and safety systems are tested.
  4. Stability/load test: Rated load and necessary overload tests are performed.
  5. Reporting: The non-conformity, repair recommendation, and subsequent inspection period will be communicated.

Commonly Encountered Nonconformities

  • Outrigger/foot and tilt sensor malfunction
  • Leaks in hydraulic cylinders and hoses.
  • Emergency download system not working.
  • Missing basket railing and safety belt attachment points.
  • Overload warning system is disabled.
  • Joint/pin wear and weld cracks

Relevant Standards

MEWP examinations; TS EN 280 / TS EN 280-1 (design and testing), ISO 18893 (safe use and inspection) is carried out in accordance with the Work Equipment Regulation. (MEWP inspection is outside the scope of AES's TÜRKAK accreditation and is carried out by our authorized engineers.)

Frequently Asked Questions

How often should a manlift be inspected?

Legally, this should be done at most every 12 months. For rental fleets and intensive construction site use, shorter periods and more frequent pre-inspections are recommended.

Are scissor lifts and boom lifts included in the same category?

Yes. All types of crane platforms, including scissor lifts, articulated/telescopic boom lifts, masts, and basket lifts, are subject to periodic inspection as lifting/conveying equipment.

Why is an emergency download test important?

The functionality of the emergency lowering system, which safely lowers the operator in the event of power or hydraulic loss, is verified at each inspection.

Frequently Asked Questions

MEWP/manlift periyodik kontrolü ne sıklıkla gerekir?

Yükseltilebilen seyyar iş platformları (MEWP), İş Ekipmanları Yönetmeliği gereği standartlarda aksi belirtilmedikçe en az yılda bir periyodik kontrole tabidir.

MEWP kontrolünde nelere bakılır?

TS EN 280 ve ISO 18893 esas alınarak kararlılık, yük ve aşırı yük sistemleri, acil indirme tertibatı, düşmeyi önleme donanımı, hidrolik ve yapısal bütünlük kontrol edilir; gerektiğinde yük ve kararlılık testi yapılır.

MEWP periyodik kontrolünü kim yapabilir?

Inspections are carried out by authorized engineers/technical personnel. AES Innovation independently conducts these inspections with its authorized engineers.

Free: MEWP (Manlift) Checklist

Download the free inspection checklist for your adjustable mobile work platforms:

By submitting this form you agree to receive informational emails from AES Innovation. You may unsubscribe at any time.

Related Services