The need for lightning protection depends on the building's use, height, location, lightning intensity, and content (flammable materials, critical electronics, human density). This preliminary assessment indicates your priority level; Detailed risk analysis is mandatory in structures containing explosive atmospheres..
Lightning Risk — Preliminary Assessment
Select the essential features of your building; determine your priority in terms of lightning protection. This preliminary assessment is for awareness and prioritization.
How is it calculated?
- Choose the structure's use, height, and location.
- Select the lightning intensity and current protection status.
- Indicate the flammable material/critical electronics/human density and press Evaluate.
Frequently Asked Questions
Does my building need a lightning rod?
What is lightning risk analysis?
Is this tool a complete risk analysis?
Related tools and services
This tool and its content are for general informational purposes only; they do not constitute a binding inspection/declaration of conformity. Definitive results will be determined through on-site inspection in accordance with relevant legislation and standards. Get a quote →