Is Lightning Protection Necessary? (Risk Assessment)
The need for lightning protection depends on the building's use, height, location, lightning intensity, and content (flammable materials, critical electronics, human density). This preliminary assessment indicates your priority level; Detailed risk analysis is mandatory in structures containing explosive atmospheres..
Lightning Risk — Preliminary Assessment
Select the essential features of your building; determine your priority in terms of lightning protection. This preliminary assessment is for awareness and prioritization.
How is it calculated?
- Choose the structure's use, height, and location.
- Select the lightning intensity and current protection status.
- Indicate the flammable material/critical electronics/human density and press Evaluate.
Frequently Asked Questions
Does my building need a lightning rod?
What is lightning risk analysis?
Is this tool a complete risk analysis?
Related tools and services
This tool and its content are for general informational purposes only; they do not constitute a binding inspection/declaration of conformity. Definitive results will be determined through on-site inspection in accordance with relevant legislation and standards. Get a quote →