{"id":3459,"date":"2026-02-22T00:57:18","date_gmt":"2026-02-21T21:57:18","guid":{"rendered":"https:\/\/aesinn.com\/?post_type=referanslar&#038;p=3459"},"modified":"2026-02-24T19:24:26","modified_gmt":"2026-02-24T16:24:26","slug":"elsitel-elektromekanik","status":"publish","type":"referanslar","link":"https:\/\/aesinn.com\/en\/referanslar\/elsitel-elektromekanik\/","title":{"rendered":"Elsitel Electromechanical"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Within the scope of the Kaya\u015f-Yerk\u00f6y High-Speed Train Project, carried out by TCDD with Do\u011fu\u015f \u0130n\u015faat as the main contractor and Elsitel Elektromekanik as the subcontractor, a functional design document was prepared for the 154\/27.5 kV transformer substations, and the design of the transformer substations was completed. In accordance with the design document submitted to the institution, the relevant transformer substations were constructed and put into operation.<\/p>","protected":false},"excerpt":{"rendered":"<p>Within the scope of the Kaya\u015f-Yerk\u00f6y High-Speed Train Project, carried out by TCDD with Do\u011fu\u015f \u0130n\u015faat as the main contractor and Elsitel Elektromekanik as the subcontractor, the 154\/27.5 kV\u2026<\/p>","protected":false},"featured_media":3468,"template":"","meta":{"_acf_changed":true,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kadence_starter_templates_imported_post":false,"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","slim_seo":{"title":"Elsitel Elektromekanik - AES Innovation","description":"TCDD taraf\u0131ndan Do\u011fu\u015f \u0130n\u015faat y\u00fcklenicili\u011finde ve Elsitel Elektromekanik alt y\u00fcklenicili\u011finde y\u00fcr\u00fct\u00fclen Kaya\u015f-Yerk\u00f6y Hatt\u0131 Y\u00fcksek H\u0131zl\u0131 Tren Projesi kapsam\u0131nda,"}},"sektor":[32],"class_list":["post-3459","referanslar","type-referanslar","status-publish","has-post-thumbnail","hentry","sektor-elektromekanik"],"acf":[],"taxonomy_info":{"sektor":[{"value":32,"label":"Elektromekanik"}]},"featured_image_src_large":["https:\/\/aesinn.com\/wp-content\/uploads\/aes-elsit-logo-referanslar.png",512,512,false],"author_info":[],"comment_info":"","_links":{"self":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/referanslar\/3459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/referanslar"}],"about":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/types\/referanslar"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/media\/3468"}],"wp:attachment":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/media?parent=3459"}],"wp:term":[{"taxonomy":"sektor","embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/sektor?post=3459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}