{"id":6432,"date":"2026-10-12T13:52:16","date_gmt":"2026-10-12T10:52:16","guid":{"rendered":"https:\/\/aesinn.com\/zpkr05-transformator-1-36-kv-periyodik-kontrol-raporu-ve-kriterleri\/"},"modified":"2026-10-12T13:52:16","modified_gmt":"2026-10-12T10:52:16","slug":"zpkr05-transformator-1-36-kv-periyodik-kontrol-raporu-ve-kriterleri","status":"publish","type":"post","link":"https:\/\/aesinn.com\/en\/zpkr05-transformator-1-36-kv-periyodik-kontrol-raporu-ve-kriterleri\/","title":{"rendered":"Transformer 1-36 kV Visual Inspection and Grounding Periodic Inspection Report (ZPKR05) and Criteria (ZPKK05): Ministry Format"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Ministry of Labor and Social Security, <strong>Transformer 1-36 kV visual inspection and grounding.<\/strong> a mandatory report format for periodic inspections<strong>ZPKR05<\/strong>) and control criteria document (<strong>ZPKK05<\/strong>(published. The documents were published on July 18, 2025; <strong>01.09.2025<\/strong> From [date] onwards, the complete use of this format, both in form and content, is mandatory. The format is based on Article 14\/B of the Work Equipment Regulation; the main headings and their order remain unchanged, while the size and layout of the content may be adapted. This page summarizes, based on the documentation, what the criteria are looking for and the sections the report consists of.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Scope and report preparation rules<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>This document covers the periodic inspections of equipment in installations with voltages between 1-36 kV, as defined in the Electrical Installations High Current Installations Regulation (as written in the document).<\/li><li>The inspection report must be prepared separately for each piece of equipment (Transformer-Circuit Breaker-Substation).<\/li><li>The findings of non-conformity can be illustrated with photographs as an appendix to the report.<\/li><li>The report format includes three regulations regarding the method and scope of periodic inspections: the Regulation on Health and Safety Requirements in the Use of Work Equipment, the Regulation on Grounding in Electrical Installations, and the Regulation on High Voltage Electrical Installations.<\/li><li>In facilities with a large number of points, multiple forms may be used, or only Section 5 of the form may be duplicated.<\/li><li>The evaluation was conducted as \u201cSuitable\u201d, \u201cNot Suitable\u201d, and \u201cNot Applicable\u201d (statement in the report format).<\/li><li>The report is prepared with the number of copies indicated in both words and numbers (\u201cThis report has been prepared in \u2026\u2026\u2026\u2026 (words (numbers)) copies.\u201d).<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Control criteria (ZPKK05)<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>No<\/th><th>Criterion<\/th><th>What is checked?<\/th><th>Rest<\/th><\/tr><\/thead><tbody><tr><td>2.1<\/td><td><strong>Danger of death\/Warning sign check<\/strong><\/td><td>Safety control devices affecting work equipment must be clearly visible and identifiable, and appropriately marked where necessary.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 2.1.1 (Annex I)<\/td><\/tr><tr><td>2.2<\/td><td><strong>Electrical hazard signs<\/strong><\/td><td>All power devices, measuring transformers, measuring instruments, and fuses must have indelible, durable, and visible markings.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 19<\/td><\/tr><tr><td>2.3<\/td><td><strong>Plastic chain checks<\/strong><\/td><td>Work equipment must have appropriate safety devices to eliminate risks of parts flying off or falling from its components.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 2.5<\/td><\/tr><tr><td>2.4<\/td><td><strong>Checking the locks and lock lugs.<\/strong><\/td><td>When work equipment or hazardous parts are stopped, the power supply that powers them must also be switched off. Maintenance and repair of equipment with special risks should only be carried out by specially qualified personnel.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 2.3, Article 8(1)(b)<\/td><\/tr><tr><td>2.5<\/td><td><strong>Security barriers<\/strong><\/td><td>Except in cases of necessity, control devices should be located outside of hazardous areas and their use should not create an additional hazard.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 2.1.2<\/td><\/tr><tr><td>2.6<\/td><td><strong>Work equipment inventory check<\/strong><\/td><td>Work equipment must be adequately documented with written information and instructions, and these instructions must be kept with the equipment.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 10<\/td><\/tr><tr><td>2.7<\/td><td><strong>Periodic maintenance records<\/strong><\/td><td>Inspection results must be recorded and stored properly for review by authorities.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 7(1)(c)<\/td><\/tr><tr><td>2.8<\/td><td><strong>Emergency stop systems<\/strong><\/td><td>Depending on the hazard of the work equipment and the normal downtime, emergency stop systems must be in place when necessary.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 2.4<\/td><\/tr><tr><td>2.9<\/td><td><strong>Cutting controls<\/strong><\/td><td>Each distribution transformer must have a thermal-magnetic circuit breaker at its low-voltage output.<\/td><td>Regulation on High Voltage Electrical Installations \u2013 Article 38<\/td><\/tr><tr><td>2.10<\/td><td><strong>Differential controls<\/strong><\/td><td>Every power transformer must be equipped with secondary protection circuit breakers on both the primary and secondary sides.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 39<\/td><\/tr><tr><td>2.11<\/td><td><strong>Protection relay checks<\/strong><\/td><td>Overload protection relays should be installed on the secondary side, and load disconnecting protective devices should be present at the low-voltage feeder outputs.<\/td><td>Regulation on High Voltage Electrical Installations \u2013 Article 38<\/td><\/tr><tr><td>2.12<\/td><td><strong>Current transformer checks<\/strong><\/td><td>Current transformers for energy measurement must be Class 0.5, and for protection applications, they must be at least Class 3.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 19<\/td><\/tr><tr><td>2.13<\/td><td><strong>Voltage transformer checks<\/strong><\/td><td>Voltage transformers for energy measurement must be Class 1, and for protection applications, they must be at least Class 3.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 19<\/td><\/tr><tr><td>2.14<\/td><td><strong>Bar connections<\/strong><\/td><td>Active parts must be out of reach to prevent accidental contact, and safety distances must be maintained.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 5<\/td><\/tr><tr><td>2.15<\/td><td><strong>Grounding connections<\/strong><\/td><td>All high-current electrical equipment and protective enclosures with metal casings must be connected to grounding conductors.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 18<\/td><\/tr><tr><td>2.16<\/td><td><strong>Transformer housing checks<\/strong><\/td><td>Equipment with safety requirements depending on installation and assembly conditions should be inspected by qualified personnel before first use and after major maintenance\/repairs.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 7(1)(a)<\/td><\/tr><tr><td>2.17<\/td><td><strong>Oil level checks<\/strong><\/td><td>Oil level indicators are mandatory and should generally be marked at a reference temperature of 25\u00b0C. The oil level should be maintained above the radiator inlet level.<\/td><td>Regulation on High Voltage Electrical Installations \u2013 Article 37 (relevant technical requirements)<\/td><\/tr><tr><td>2.18<\/td><td><strong>Temperature indicators<\/strong><\/td><td>Oil temperature gauges should have dial-type displays and single or double electrical contacts for alarm\/trip functions.<\/td><td>Regulation on High Voltage Electrical Installations \u2013 Article 37 (relevant technical requirements)<\/td><\/tr><tr><td>2.19<\/td><td><strong>Buchholz relay<\/strong><\/td><td>Buchholz relays are mandatory for oil-filled transformers above 500-750 kVA, and they must have gas detection and oil level monitoring functions.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Articles 38-39 (protection systems)<\/td><\/tr><tr><td>2.20<\/td><td><strong>Pressure relief devices<\/strong><\/td><td>Pressure relief valves are necessary to protect against internal pressure build-up and must provide automatic relief when pre-set limits are exceeded.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 40<\/td><\/tr><tr><td>2.21<\/td><td><strong>Cooling systems<\/strong><\/td><td>Transformers must have adequate ventilation measures. If natural ventilation is not possible, forced or customized ventilation must be used.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 37<\/td><\/tr><tr><td>2.22<\/td><td><strong>Transformer room lighting<\/strong><\/td><td>HV switchboards and LV panel rooms must be illuminated with a minimum of 250 lux, transformer rooms with a minimum of 150 lux, and all compartments must have battery-powered emergency lighting.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 37<\/td><\/tr><tr><td>2.23<\/td><td><strong>Star point grounding<\/strong><\/td><td>Transformers require both protective and operational grounding. The operational grounding resistance should be less than 1 \u03a9.<\/td><td>Regulations on Grounding in Electrical Installations \u2013 Article 4 and related technical requirements.<\/td><\/tr><tr><td>2.24<\/td><td><strong>Tank grounding<\/strong><\/td><td>All electrical equipment with metal casings must be grounded, and the protective grounding must be connected to the environmental grounding system.<\/td><td>Regulations on Grounding in Electrical Installations \u2013 Article 4 (Definition of protective grounding)<\/td><\/tr><tr><td>2.25<\/td><td><strong>Grounding resistance measurement<\/strong><\/td><td>Periodic measurements should be taken once a year in industrial and commercial facilities, and at maximum intervals of one year in humid and wet workplaces.<\/td><td>Regulations on Grounding in Electrical Installations \u2013 Annex P (Test frequencies)<\/td><\/tr><tr><td>2.26<\/td><td><strong>Maintenance and Testing Requirements<\/strong><\/td><td>Maintenance and repairs must be carried out at the intervals specified in the technical documentation, and proper documentation and record keeping are mandatory.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 27<\/td><\/tr><tr><td>2.27<\/td><td><strong>Isolation tests<\/strong><\/td><td>All operational equipment (insulating rods, safety pliers, insulating gloves, platforms) must be tested at standard intervals.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 26<\/td><\/tr><tr><td>2.28<\/td><td><strong>Hermetic protection systems<\/strong><\/td><td>Equipment that poses a risk of gas, vapor, liquid, or dust release must be equipped with suitable systems to contain or remove these substances at their source.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 2.5.1<\/td><\/tr><tr><td>2.29<\/td><td><strong>Istanka control<\/strong><\/td><td>Insulating rods used in electrical work must have adequate insulation properties against electric current and must be tested periodically.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 9(1)(d)<\/td><\/tr><tr><td>2.30<\/td><td><strong>Isolated table control<\/strong><\/td><td>Insulated stands used for electrical safety must have the appropriate insulation level and be checked regularly.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 9(1)(d)<\/td><\/tr><tr><td>2.31<\/td><td><strong>Insulated carpet inspection<\/strong><\/td><td>Insulating mats used in front of electrical panels must provide protection against electric current and be checked for physical damage.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 9(1)(d)<\/td><\/tr><tr><td>2.32<\/td><td><strong>Electrical glove inspection<\/strong><\/td><td>Electrical gloves must be of the appropriate class for the operating voltage level, undergo visual inspection, and be periodically electrically tested.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 9(1)(a)<\/td><\/tr><tr><td>2.33<\/td><td><strong>Safety belt\/safety rope<\/strong><\/td><td>Safety harnesses and ropes used in work at height must meet appropriate standards and be regularly inspected.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 9(1)(e)<\/td><\/tr><tr><td>2.34<\/td><td><strong>Helmet and safety glasses<\/strong><\/td><td>Helmets and safety glasses used in electrical work must provide an appropriate level of protection and be in undamaged condition.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 9(1)(c)<\/td><\/tr><tr><td>2.35<\/td><td><strong>First aid supplies<\/strong><\/td><td>Sufficient and up-to-date first aid supplies should be available and easily accessible in the workplace.<\/td><td>Regulation on Health and Safety Requirements in the Use of Work Equipment \u2013 Article 11<\/td><\/tr><tr><td>2.36<\/td><td><strong>Fire extinguishers<\/strong><\/td><td>Appropriate class fire extinguishers (CO\u2082, dry chemical powder) must be available in electrical installations and their maintenance must be carried out periodically.<\/td><td>Regulations on High Voltage Electrical Installations \u2013 Article 25<\/td><\/tr><tr><td>3.0<\/td><td><strong>Preparation<\/strong><\/td><td>General information about the facility to be measured, such as the measurement date, weather conditions, and soil conditions, should be checked. Installation information, including whether a grounding project exists for the facility, should also be inquired about. Measurements should be performed without de-energization in areas with high electromagnetic interference, as measurement uncertainty will increase. The measurement is carried out under the supervision and with the knowledge of the transformer operator.<\/td><td>Regulations on Grounding in Electrical Installations, TS EN 50522 (Grounding of power installations exceeding 1 kV AC)<\/td><\/tr><tr><td>3.1<\/td><td><strong>Measurement point<\/strong><\/td><td>In protective grounding measurements, the measurement is taken from the strip bar that runs around the high-voltage cells. In operational grounding measurements, the measurement is taken from the main neutral busbar of the main distribution panel.<\/td><td>Regulations on Grounding in Electrical Installations \u2013 Appendix C<\/td><\/tr><tr><td>3.2<\/td><td><strong>Protection area mm\u00b2<\/strong><\/td><td>The suitability of the protective conductor cross-section is determined according to the earth short-circuit current.<\/td><td>Regulations on Grounding in Electrical Installations \u2013 Appendix C<\/td><\/tr><tr><td>3.3<\/td><td><strong>The suitability of the grounding voltage generated by the measured protective grounding.<\/strong><\/td><td>RB is operational grounding, RE is protective grounding; tE is the current setting for the circuit breaker tripping time to ground, UTP is taken from Figure 6 of the ETTY depending on the tE circuit breaker tripping time, IE is the ground short-circuit current calculated according to the RN resistance on the secondary side of the 154 kV \/ 34.5 kV transformer. UE = IE.RE; if UE &lt; 2.UTP, compliance is granted; if UE &lt; 4.UTP, compliance is granted after checking the measures M specified in the Grounding Regulation. Additional measures: if UE &lt; 2.USTP, compliance is granted; if UE &lt; 4.USTP, compliance is granted after checking the measures Annex-M specified in the ETTY.<\/td><td>Regulations on Grounding in Electrical Installations \u2013 Annex-C, Figure-6, Annex-M<\/td><\/tr><tr><td>3.4<\/td><td><strong>Suitability of grounding voltage when operational and protective grounding are combined.<\/strong><\/td><td>Grounding voltage conditions in combined grounding: If the LV side TN and PEN are grounded at a single point, UE &lt; UTP; if the LV side TN and PEN are grounded at multiple points, UE &lt; 2.UTP; if the LV side TT, U2 = UE + 0.23 kV and U2 &lt; 1.2 kV.<\/td><td>Regulations on Grounding in Electrical Installations \u2013 Annex-M<\/td><\/tr><tr><td>3.N<\/td><td><strong>Notes section<\/strong><\/td><td>Corrosion, rupture, and cross-sectional problems observed in the grounding system are noted in the notes section, and recommendations are made; the system is evaluated according to the nature of the defect. The full names, signatures, professional titles, diploma numbers, date and number, project approval validity period, etc., of those who approved the project will be included.<\/td><td>Regulations on Grounding in Electrical Installations<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Limit values and thresholds in the document<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Scope: Equipment located in installations with voltage ranges of 1-36 kV.<\/li><li>Current transformer: Class 0.5 for energy measurement.<\/li><li>Current transformer: minimum Class 3 for protection applications.<\/li><li>Voltage transformer: Class 1 for energy measurement.<\/li><li>Voltage transformer: minimum Class 3 for protection applications.<\/li><li>Oil level indicators: should generally be marked at a reference temperature of 25\u00b0C.<\/li><li>Buchholz relay: Mandatory for oil-filled transformers above 500-750 kVA.<\/li><li>Lighting: HV cells and LV switchboard rooms minimum 250 lux.<\/li><li>Lighting: transformer rooms minimum 150 lux.<\/li><li>Star point grounding (ZPKK05): operating grounding resistance must be less than 1 \u03a9.<\/li><li>Grounding resistance measurement: once a year in industrial and commercial facilities.<\/li><li>Grounding resistance measurement: in damp and wet workplaces, at maximum intervals of 1 year.<\/li><li>Basis for preparation: TS EN 50522, grounding of power installations exceeding 1 kV AC.<\/li><li>IE ground short-circuit current: Calculated according to the RN resistance on the secondary side of the 154 kV \/ 34.5 kV transformer (in the report: current neutral resistance RN in the 154 kV supply)<\/li><li>Separate grounding: If UE = IE.RE; UE &lt; 2.UTP, then compatibility is granted.<\/li><li>Separate grounding: If UE &lt; 4.UTP, compliance is granted after checking ETTY M measures.<\/li><li>Additional measures: If UE &lt; 2.USTP, conformity is granted.<\/li><li>Additional measures: If UE &lt; 4.USTP, conformity is granted after checking the measures in Annex M of ETTY.<\/li><li>Combined grounding, LV side TN and PEN grounded at a single point: UE \uff1c UTP (UE = IE.RbE in the report)<\/li><li>Combined grounding, LV side TN and PEN grounded at multiple points: UE \uff1c 2.UTP<\/li><li>Combined grounding, LV side TT: U2 = UE + 0.23 kV; U2 \uff1c 1.2 kV<\/li><li>Rapor 2.2: tesisatta kapsaml\u0131 de\u011fi\u015fiklik \u00f6l\u00e7\u00fct\u00fc \uff1e%20 (Var\/Yok)<\/li><li>Report Transformer Section, item 8: Inspection of self-protection systems if the transformer is 630 kVA or higher.<\/li><li>Report Conclusion and Opinion (ZPKR05): If RB &lt; 2 \u03a9 in the disconnected state, the operational grounding is inadequate.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Sections of the report format (ZPKR05)<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>1. COMPANY INFORMATION<\/li><li>2. EQUIPMENT INFORMATION<\/li><li>2.1. LABEL AND DETAILS<\/li><li>2.2. INFORMATION OBTAINED<\/li><li>3. INFORMATION ON MEASURING INSTRUMENTS<\/li><li>4. VISUAL INSPECTION CRITERIA (sub-tables: GENERAL INSPECTIONS; TRANSFORMER SWITCHED CELL INSPECTIONS; TRANSFORMER SECTION; OCCUPATIONAL SAFETY AND PROTECTIVE EQUIPMENT INSPECTION; TRANSFORMER OPERATION AND PROTECTIVE GROUNDING)<\/li><li>5. DISCLOSURE OF DEFECTS<\/li><li>6. NOTES<\/li><li>7. CONCLUSION AND OPINION<\/li><li>8. INFORMATION AND APPROVAL OF THE PERSON AUTHORIZED TO CONDUCT PERIODIC INSPECTIONS.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The main information requested in the report is:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Heading block: Report title \u201cTRANSFORMER 1-36kV (HV) VISUAL INSPECTION AND GROUNDING INSTALLATION PERIODIC INSPECTION REPORT\u201d; Document Code ZPKR05, Publication Date 18.07.2025, Revision No -, Revision Date -, Effective Date 01.09.2025; unlabeled empty cells to the left of the title.<\/li><li>1. Company Information: Company Name; Periodic Inspection Address; Social Security Registration Number; Report Number; Report Date; OHS-KATIP Contract ID; Periodic Inspection Start Date and Time; Periodic Inspection End Date and Time; Date of the Next Periodic Inspection; Periodic Inspection Method and Scope (three regulations printed).<\/li><li>2.1. Labeling and Detailed Information: Energy provider; Network type (TT \/ IT \/ TN; TN-CS \/ TN-C \/ TN-S); Network voltage; Is there a project for the facility? (Yes\/No); Is there a single-line diagram? (Yes\/No); Reason for inspection (Periodic Inspection \/ Initial Inspection); Grounding electrode type (Ring \/ Surface \/ Foundation \/ Deep \/ Undetermined); Building type (Residential \/ Commercial \/ Industrial \/ Other); Intended use of the equipment; Last inspection date.<\/li><li>2.1. Labeling and Detailed Information (continued): Installation type (Pole \/ Concrete Kiosk \/ Building \/ Indoor \/ Underneath Building \/ Sheet Metal Kiosk); Power (kVA); Voltage Primary\/Secondary (kV); Year of manufacture; Serial number; Connection group (DYN11 \/ DYN5); Cell information (Open type \/ MMMH-Air \/ MMMH-Gas); Type (Dry \/ Hermetic \/ Expansion Tank); Weather conditions and temperature; Ground moisture content.<\/li><li>2.2. Tespit Edilen Bilgiler: Tesisatta kapsaml\u0131 de\u011fi\u015fiklik var m\u0131 (\uff1e%20) (Var\/Yok); Y\u00fcksek gerilim \u015febeke tipi (Y\u0131ld\u0131z noktas\u0131, de\u011feri d\u00fc\u015f\u00fck bir empedans \u00fczerinden topraklanm\u0131\u015f \u015febeke \/ Y\u0131ld\u0131z noktas\u0131 yal\u0131t\u0131lm\u0131\u015f \u015febeke \/ Toprak temas\u0131 kompanze edilmi\u015f (rezonans toprakl\u0131) \u015febeke); Yetkilendirilmi\u015f YG i\u015fletme sorumlusu ve onay bilgileri.<\/li><li>3. Measurement Instrument Information: Side-by-side columns for two devices; for each: Device name, Calibration date, Calibration validity date, Serial number, Calibration number.<\/li><li>4. Visual Inspection Criteria tables consist of the following columns: Sequence \/ Inspection Item \/ Compliance Grade.<\/li><li>4 \u2013 General Checks (32 items): 1. Cell door danger\/Warning sign\/Plastic chain; 2. Locks and lock hooks; 3. Indoor and outdoor wire fences; 4. Connection of cell doors, windows, and other components to the grounding system; 5. Cracks, subsidence, dampness, plaster, and whitewash in the cell&#039;s foundation and walls; 6. Doors, windows, ventilation, and mosquito nets; 7. Whether the building is leaking water; 8. Absence of exposed cables on the ground inside and outside the building; 9. Need for painting of the cell&#039;s metal structures; 10. Environmental cleanliness; 11. HV cable installation; 12. LV cable installation; 13. LV-HV busbars; 14. Infrared thermal camera inspection of the cell&#039;s casing; 15. Infrared thermal camera inspection of electrical components on the transformer; 16. Infrared thermal camera inspection of HV and LV connections; 17. Casing grounding connection (Missing, decaying, deformed, damaged); 18. Operational grounding connection (Missing, decaying, deformed, damaged); 19. Surge arresters (missing, decaying, deformed, damaged); 20. Indoor AC\/DC lighting; 21. Maneuvering, occupational safety instructions and single-line diagram; 22. Absence of energized parts in the touch zone; 23. Signal lamps; 24. Battery, rectifier group; 25. Mechanical strength and corrosion control of grounding, protection, operational grounding and potential equalization conductors, if any; 26. Thermal resistance to the highest fault current; 27. Panel heating systems; 28. Safety of living beings against voltages that may occur in grounding installations at the highest ground fault current (protection against indirect contact); 29. Arrangement and organization in the transformer room and the presence of materials prohibited from storage by legislation; 30. Condition and suitability of fire extinguishing and detection measures according to transformer type; 31. Safety distances to transformers and, if any, power transmission lines; 32. Suitability of the oil pit in oil-filled transformers.<\/li><li>4 \u2013 Transformer Switched Switching Cell Controls (16 items): 1. Door danger\/Warning sign\/Plastic chain condition; 2. Door connection to grounding system; 3. Cracks, subsidence, moisture, plaster, whitewash in foundation and walls; 4. Painting needs of metal structures; 5. Corrosion on the inlet-outlet-measurement-transformer protection modular cell body and cover; 6. Fixing of inlet-outlet-measurement-transformer protection modular cells to each other and to the ground; 7. Operation of indicators; 8. If HV fused protection, fuse direction and wire not being wound; 9. If HV fused protection, fuse suitability; 10. If gas-filled cell, gas pressure and warning lights; 11. Cleaning of top, connection and surroundings; 12. HV cable\/busbar installation; 13. HV connection inspection with infrared thermal camera; 14. Inspection of measuring transformers with infrared thermal camera; 15. Checking the appropriate values of protection relays; 16. Seals.<\/li><li>4 \u2013 Transformer Compartment (11 items): 1. Condition of door death hazard\/warning sign\/plastic chain; 2. No missing parts, corrosion, or deformation in the transformer housing; 3. No oil leakage in the transformer tank; 4. No missing parts, corrosion, or deformation in the bushings; 5. No missing parts, corrosion, or deformation in the arc horns; 6. Transformer oil level suitability; 7. Transformer silica gel suitability; 8. Self-protection if the transformer is 630 kVA or higher; 9. Buchholz relay; 10. Hermetic relay; 11. Temperature alarm relay.<\/li><li>4 \u2013 Occupational Safety and Protective Equipment Inspection (4 items): 1. Stirring rod; 2. Insulated stand; 3. Insulated mat; 4. Gloves.<\/li><li>4 \u2013 Transformer Operational and Protective Earthing (with Compliance Note column) \/ 1- Separate Earthing: Transformer Operational Earthing Rb=\u2026\u03a9; 1.1 Compliance of protective earthing (RE) according to touch voltage (UTP): Ztotal (sum of resistances and impedances in the earth short-circuit loop, \u03a9), current neutral resistance RN (\u03a9) in 154 kV supply, earth short-circuit current IE (kA), earth short-circuit trip time tE (s), touch voltage UTP (kV); 1.2 Earthing voltage UE=IE.RE (kV), comparison &lt;2 UTP and 4UTP (M measures); additional measure touch voltage USTP (kV), comparison &lt;2 USTP and 4USTP (M measures); Transformer Protective Earthing RE=\u2026\u03a9.<\/li><li>4 \u2013 Transformer Operation and Protection Grounding \/ 2- Combined Grounding: 2.1 If the LV side TN and PEN are grounded at a single point, UE=IE.RbE, UE \uff1c UTP, RbE=\u2026\u03a9; 2.2 If the LV side TN and PEN are grounded at multiple points, UE=IE.RbE, UE \uff1c 2.UTP, RbE=\u2026\u03a9; 2.3 If the LV side is TT, the breakdown voltage U2=UE+0.23 kV, U2 \uff1c 1.2 kV, RbE=\u2026\u03a9.<\/li><li>5. Defect Descriptions: Free text field (with defect level indicated by * \/ **).<\/li><li>6. Notes: free text area.<\/li><li>7. Conclusion and Opinion: The selection of &quot;suitable\/unsuitable for use under existing conditions&quot; after the inspection of the Grounding System with the technical specifications stated above as of the periodic inspection date; criteria for unsuitability: (1) if RB &lt; 2 \u03a9 in the separate case; (2) if, for the UE calculated according to RE in the separate case, a) UE &lt; 2UTP or b) UE &lt; 4UTP (with ETTY M measures) or c) UE &lt; 2USTP or d) UE &lt; 4USTP (with ETTY M measures); (3) if, in the combined case, a) TN-PEN single point UE &lt; UTP or b) TN-PEN multi-point UE &lt; 2UTP or c) TT if U2 = UE + 0.23 &lt; 1.2 kV.<\/li><li>8. Information and Approval of the Person Authorized to Conduct Periodic Inspections: Name and Surname; Profession; Authorized Person Registration Number; Signature.<\/li><li>Copy information: \u201cThis report has been prepared in \u2026\u2026\u2026\u2026 (writing (numbers)) copies.\u201d<\/li><li>Appendix: Findings of non-conformity can be included in the report with photographs (within the scope of the criteria document).<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Defect rating and notes in the document<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Note 1 (ZPKK05): The degree of defect is indicated by \u201c*\u201d for slightly defective and \u201c**\u201d for defective.<\/li><li>Note 2 (ZPKK05): The criteria specified in the inspection report may vary depending on the equipment&#039;s place of use, purpose, type, model, etc. If the specified risks are not present in the equipment, based on the relevant manufacturing legislation and\/or standard, the inspection criteria will not be sought. The decision on whether or not to seek a criterion specified in the inspection report should be made by paying attention to the legislation and\/or standard clauses referenced in the standard clause section. The type, model, year of manufacture, etc., of the equipment where the specified criterion should be present should be evaluated according to the legislation and\/or standard clauses. The inclusion of a criterion in the inspection report does not mean that it is a mandatory criterion for every piece of equipment.<\/li><li>Note 3 (ZPKK05): In grounding checks of electrical installations outside the panel, such as cable trays, connection checks, junction boxes, building junction boxes, and lighting fixture connections, the measurement point is numbered. If possible, it is marked on the site plan.<\/li><li>Note 4 (ZPKK05): When using thermal cameras for heating and connection point checks, no additional training is required unless otherwise specified by the ministry.<\/li><li>ZPKR05 (After 5th Defect Explanation): Defect degree \u201c*\u201d means slightly defective and \u201c**\u201d means seriously defective. The evaluation was done as \u201cSuitable\u201d, \u201cNot Suitable\u201d and \u201cNot Applicable\u201d.<\/li><li>ZPKR05 (Section 5, Defect Explanations): Multiple forms may be used in facilities with a large number of points. Alternatively, only Section 5 of the form may be duplicated.<\/li><li>ZPKR05 (7. Conclusion and Opinion): The touch voltage UT, UTP and the cross-section of the protective conductors are regulated according to the relevant articles of the Regulations on Grounding in Electrical Installations.<\/li><li>ZPKR05 (7. Conclusion and Opinion): Note 1: Suitable. Note 2: Insufficient.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">The scope of AES Innovation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This inspection is outside the scope of AES Innovation&#039;s accreditation (our accreditation area is periodic inspection of electrical installations); the inspection is carried out by our authorized engineers registered with EK\u0130PNET. The use of the Ministry&#039;s format is mandatory, regardless of who performs the inspection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the inspection to be carried out, a contract must be drawn up and approved between the employer and the authorized person conducting the inspection via the ISG-KATIP system at least one day prior to the inspection; a report issued without such a contract is invalid.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/aesinn.com\/en\/iletisim\/\">Get a Quote for Periodic Inspection<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/trafo-ve-guc-sistemleri\/transformator-muayenesi\/\">Service page<\/a> \u00b7 <a href=\"https:\/\/aesinn.com\/en\/periyodik-kontrol-isg-katip-sozlesmesi-ekipnet-zorunlu-rapor-formatlari\/\">ISG-KATIP contract and mandatory report formats<\/a> \u00b7 <a href=\"https:\/\/aesinn.com\/en\/is-ekipmanlari-yonetmeligi\/\">Work Equipment Regulation and Annex III<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sources<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/isekipmanlari.csgb.gov.tr\/dokumanlar.aspx\">Ministry of Labor and Social Security Work Equipment documents: ZPKK05 and ZPKR05 (Mandatory Documents)<\/a><\/li><li><a href=\"https:\/\/isekipmanlari.csgb.gov.tr\/detay.aspx?d=1043\">Ministry of Labor and Social Security: Mandatory periodic inspection report format and criteria for electrical group work equipment.<\/a><\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Since when has the ZPKR05 format been mandatory?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">According to the ministry&#039;s announcement, as of September 1, 2025, the complete and accurate use of this format is mandatory for visual inspections and grounding periodic checks of transformers (1-36 kV).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can the format&#039;s appearance be changed?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The content can be used with the same size and layout as the main headings, but without changing their order.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is every item in the criteria document required for every piece of equipment?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. According to the document&#039;s note, the criteria may vary depending on the equipment&#039;s place of use, purpose, type, and model; whether or not a criterion is required for that equipment is determined by examining the relevant legislation and standard articles.<\/p>","protected":false},"excerpt":{"rendered":"<p>Ministry&#039;s mandatory ZPKR05 periodic inspection report format and ZPKK05 criteria: what is inspected, limit values, report sections.<\/p>","protected":false},"author":1,"featured_media":2568,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kadence_starter_templates_imported_post":false,"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","slim_seo":{"title":"Transformer 1-36 kV Periodic Inspection Report (ZPKR05) and Criteria (ZPKK05)","description":"Transformer 1-36 kV Visual Inspection and Grounding Periodic Inspection: Ministry's mandatory ZPKR05 report format and ZPKK05 criteria, measurements and limit values."},"_slim_seo_primary_term_category":0,"_slim_seo_primary_term_post_tag":0,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-6432","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-periyodik-kontrol-rehberi"],"acf":[],"taxonomy_info":{"category":[{"value":37,"label":"Periyodik Kontrol Rehberi"}]},"featured_image_src_large":["https:\/\/aesinn.com\/wp-content\/uploads\/aes-thumbnail.png",768,768,false],"author_info":{"display_name":"Emre Metin","author_link":"https:\/\/aesinn.com\/en\/author\/yonetim\/"},"comment_info":"","category_info":[{"term_id":37,"name":"Periyodik Kontrol Rehberi","slug":"periyodik-kontrol-rehberi","term_group":0,"term_taxonomy_id":37,"taxonomy":"category","description":"Periyodik kontrol ve muayene hakk\u0131nda pratik rehberler: yasal s\u00fcreler, kontrol s\u0131kl\u0131\u011f\u0131, kurulu\u015f se\u00e7imi.","parent":0,"count":21,"filter":"raw","cat_ID":37,"category_count":21,"category_description":"Periyodik kontrol ve muayene hakk\u0131nda pratik rehberler: yasal s\u00fcreler, kontrol s\u0131kl\u0131\u011f\u0131, kurulu\u015f se\u00e7imi.","cat_name":"Periyodik Kontrol Rehberi","category_nicename":"periyodik-kontrol-rehberi","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/posts\/6432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/comments?post=6432"}],"version-history":[{"count":0,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/posts\/6432\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/media\/2568"}],"wp:attachment":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/media?parent=6432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/categories?post=6432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/tags?post=6432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}