{"id":6534,"date":"2026-11-09T03:40:46","date_gmt":"2026-11-09T00:40:46","guid":{"rendered":"https:\/\/aesinn.com\/?page_id=6534"},"modified":"2026-11-09T09:21:11","modified_gmt":"2026-11-09T06:21:11","slug":"enerji-analizi-nasil-yapilir","status":"publish","type":"page","link":"https:\/\/aesinn.com\/en\/test-ve-olcum-hizmetleri\/guc-kalitesi-olcumleri\/enerji-analizi-nasil-yapilir\/","title":{"rendered":"What is Energy Analysis and How is it Performed? Power Quality Measurement Guide"},"content":{"rendered":"<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p><strong>Short answer:<\/strong> Energy analysis involves continuously recording voltage, current, harmonics, reactive energy, and voltage events for at least one week using a Class A energy analyzer connected to the main distribution panel, and interpreting these measurements according to references such as EN 50160 and IEEE 519. The aim is to identify the cause of tripping, overheating, and reactive power charges, and to base compensation or filter decisions on these measurements.<\/p><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">In the field, \u201cenergy analysis,\u201d \u201cgrid analysis,\u201d and \u201cpower quality measurement\u201d often refer to the same thing: measuring and determining the quality of electricity arriving at the facility and how the facility changes this quality under its own loads. For a facility experiencing frequent power factor failures or incurring reactive power charges on its bill, the first question shouldn't be \u201cwhat should we buy?\u201d but rather \u201cwhat is actually happening on the grid?\u201d.<\/p>\n\n\n\n<div class=\"aes-ortak-notu\" style=\"border-left:4px solid #CE1A1A;background:#f6f6f6;padding:14px 18px;margin:18px 0 22px 0;font-size:15px;line-height:1.6;color:#222;\"><strong>Service note:<\/strong> AES Innovation performs the measurements and evaluations described on this page with its own engineers. Energy analysis, harmonic measurement, and compensation evaluation are outside the scope of our T\u00dcRKAK accreditation; our accreditation scope includes periodic inspections of grounding, leakage current, switchboards, and thermography in low-voltage installations.<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">What is energy analysis, and how does it differ from an energy audit?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In energy analysis, a power quality analyzer is connected to the panel, and the electrical behavior of the facility is recorded for days. The study under the Energy Efficiency Law (5627) is a different matter. The law defines the study as a work consisting of information gathering, measurement, evaluation, and reporting stages to reveal opportunities to improve energy efficiency (Article 3\/1-m). In practice, the study is a savings effort that considers fuel, steam, compressed air, and electricity together. The law obligates industrial enterprises with annual energy consumption of 1000 TEP (tons of equivalent petroleum) and above, and commercial, service, and public buildings of a certain size, to employ an energy manager (Article 3\/1-i, Article 7\/1-a). It lists the study among the duties of licensed consulting companies (Article 5\/1-d) and mandates the use of calibrated and labeled devices in the study (Article 7\/1-g).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Power quality measurement can provide data for the electrical component of a study, but it is not a study in the legal sense on its own; nor is the purpose of an efficiency study to find the cause of harmonic resonance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When is energy analysis necessary?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In practice, the demand for measurements most often arises from the following situations:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Unexplained circuit breaker and residual current device tripping, drive errors.<\/li>\n\n<li>Unexpected heating in transformers, cables, busbars, or neutral wires.<\/li>\n\n<li>Swollen capacitors, frequent fuse blowing, contactor failures.<\/li>\n\n<li>Before compensation upgrades, transition to a reactor system, or filter investment.<\/li>\n\n<li>Before adding a large drive or uninterruptible power supply (UPS) or increasing contract power<\/li>\n\n<li>When a reactive power charge appears on the bill<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A filter or reactor taken without measurement may not solve the problem, and may even create a new resonance. The Regulation on the Preparation of Electrical Internal Installation Projects also requires the calculation of the total load current, the resonance frequency, and the determination of the reactor\/capacitor ratio for harmonic loads in the final project of a reactive power compensation system (Article 10\/c-4); the regulation also applies to the modified or expanded parts of existing installations (Article 3). In an operational installation, the realistic input for these calculations is the measured harmonic current spectrum.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An important distinction is made regarding reactive power charges: The Electricity Grid Regulation limits the ratio of inductive reactive energy to active energy to twenty percent and the ratio of capacitive reactive energy to fifteen percent per month; however, this provision applies to consumers directly connected to the transmission system and distribution license holders (Article 14\/1), and the sanctions are regulated in the connection and system usage agreements (Article 14\/4). The rate and charge applied to distribution-connected facilities are determined in the agreement with the distribution company and in the tariff decisions of the Energy Market Regulatory Authority (EPDK); in practice, the same 20%\/15% rates are common, and your bill and agreement are binding. Energy analysis shows at what time and under what load the overcharge occurred.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/test-ve-olcum-hizmetleri\/guc-kalitesi-olcumleri\/reaktif-enerji-cezasi-ve-kompanzasyon\/\">Reactive Energy Penalty and Compensation<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How is the measurement taken?<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Device: Class A and Class S<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Power quality measurement methods are defined in IEC 61000-4-30. In the 2nd edition of the standard (2008), Class A is for applications requiring precise results; examples include contractual measurement, dispute resolution, and conformity verification. When two devices in this class measure the same signal, their results overlap within the margin of uncertainty. Class S is intended for survey-type statistical studies; the measurement ranges are the same as Class A, but the data processing requirements are less stringent (clause 4.1). For example, the uncertainty in voltage magnitude is at most \u00b10.1% of the declared input voltage in Class A and at most \u00b10.5% in Class S (clause 5.2.2). Voltage harmonics are measured to at least the 50th degree in Class A; the lower limit in Class S is the 40th degree required by the EN 50160 assessment (clause 5.8.1).<\/p>\n\n\n\n<div class=\"aes-bilgi-notu\" style=\"border-left:4px solid #9AA0A7;background:#f6f6f6;padding:14px 18px;margin:18px 0 22px 0;font-size:15px;line-height:1.6;color:#222;\"><strong>Notes:<\/strong> EN 50160:2022 refers to the 2015 edition of IEC 61000-4-30 (clause 2); the information here is based on the 2008 edition. See the edition in the manufacturer's declaration of conformity.<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Measurement ranges<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In Class A, the basic measurement range for voltage, harmonics, and imbalance is 10 cycles on a 50 Hz network, i.e., approximately 200 ms. These values are combined in 150 cycles (approximately 3 seconds), 10-minute, and 2-hour intervals (clause 4.4); the combination is done by taking the square root of the arithmetic mean of the squares, excluding flickering (clause 4.5.1), and the 2-hour value consists of twelve 10-minute values (clause 4.5.4). Other parameters are flagged during dips, surges, or interruptions so that a single event is not counted twice; the user or application decides how the flagged data is used (clause 4.7), and the report must clearly state this.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Measurement point<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For a general overview of the installation, the main measurement is taken at the low-voltage (LV) output of the transformer or at the input of the main distribution panel; the total load, the quality of the incoming voltage, and the harmonics the installation reflects onto the grid are all visible here. If a source is being sought, a second device takes a shorter reading on the line feeding the drive, UPS, or compensation panel. In four-wire systems, phase-to-neutral voltages are evaluated, and in three-wire systems, inter-phase voltages are evaluated (EN 50160:2022, clause 4.1). Current can be measured in every conductor, including the neutral (IEC 61000-4-30, clause 4.3); in an installation with harmonics, the neutral current must be recorded. The uncertainty of current probes and measuring transformers outside the device falls outside the normative requirements of the standard (clause 4.2); therefore, the probe type and ratio must be specified in the report.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Duration: Why a week?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">EN 50160 evaluates continuous out-of-band events on a weekly basis (an annual rate is given for frequency). For example, in the supply voltage, 95% of the effective values for 10 minutes in each weekly period should remain within the \u00b110% band of the rated voltage (Un), and a week is 1,008 10-minute intervals (clause 4.2.2.2). 5% of 1,008 intervals is approximately 50 intervals, or about 8 hours of out-of-band values in total; this statistic cannot be established with a few hours of recording. IEEE 519-2014 also recommends calculating 95% and 99% percentages for 10-minute harmonic values over a 7-day period (clause 4.4).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The measurement week should represent normal operation; weekdays and weekends should be recorded at full and low load. Holidays, extended maintenance shutdowns, or weeks operating at half capacity will disrupt the data; if such a period occurs, the recording should be extended or repeated.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quantities measured in energy analysis<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The effective voltage values for 10 minutes, showing the lowest and highest values by phase.<\/li>\n\n<li>Network frequency in 10-second averages.<\/li>\n\n<li>Voltage imbalance (ratio of the negative phase-sequence component to the positive phase-sequence component)<\/li>\n\n<li>Short-term (Pst, 10 minutes) and long-term (Plt, 2 hours) blinking intensity.<\/li>\n\n<li>Voltage harmonics and total harmonic distortion (THD) of voltage.<\/li>\n\n<li>Current harmonics, current THD-I (THD-I), and total demand distortion (TDD)<\/li>\n\n<li>Power factor, inductive and capacitive reactive energy.<\/li>\n\n<li>Active and reactive power demand profile<\/li>\n\n<li>Voltage dips, surges, and interruptions (timestamp, duration, residual voltage)<\/li>\n\n<li>Neutral current and harmonic components in the neutral<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">THD gives the harmonic content according to the current fundamental component, while TDD gives it according to the maximum demand current (IL). IL is the average of the maximum demand currents at the point of common coupling (PCC) for each of the last twelve months (IEEE 519-2014, clause 3). Therefore, at low load, TDD gives a more realistic picture than THD-I.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/test-ve-olcum-hizmetleri\/guc-kalitesi-olcumleri\/harmonik-nedir-thd-tdd-sinir-degerleri\/\">What are Harmonics? THD, TDD, and Limit Values<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Low voltage values according to EN 50160.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The measured voltage is usually compared with EN 50160. In the LV section of the standard, the rated voltage Un is 230 V for phase-to-neutral systems in four-wire systems and phase-to-phase systems in three-wire systems (clause 4.1). Summary for normal operating conditions:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Size<\/th><th>Value (AG)<\/th><th>Evaluation<\/th><th>EN 50160:2022+A1:2025<\/th><\/tr><\/thead><tbody><tr><td>Network frequency<\/td><td>50 Hz \u00b11% for 99.5% of the year; 50 Hz +4%\/\u22126% always<\/td><td>10 seconds average, interconnected network<\/td><td>Article 4.2.1<\/td><\/tr><tr><td>Supply voltage variations<\/td><td>95% of the 10-minute values are within Un \u00b110%; all are within Un +10%\/\u221215%.<\/td><td>Weekly<\/td><td>Article 4.2.2.2<\/td><\/tr><tr><td>Intensity of flickering<\/td><td>Plt \u2264 1, 95% of the time<\/td><td>Weekly<\/td><td>Article 4.2.3.2<\/td><\/tr><tr><td>Voltage imbalance<\/td><td>Negative sequence\/positive sequence 0\u20132%, in 95% of 10-minute values.<\/td><td>Weekly<\/td><td>Article 4.2.4<\/td><\/tr><tr><td>Voltage harmonics<\/td><td>Individual harmonics: 95% of 10-minute values within the Table 1 values; in addition THD \u2264 8% (up to the 40th order)<\/td><td>Weekly<\/td><td>Article 4.2.5<\/td><\/tr><tr><td>Voltage drop and surge<\/td><td>Start thresholds of 90% and 110%; no limit, classification only<\/td><td>Event count<\/td><td>Articles 3.3.9, 3.3.15, 4.3.2<\/td><\/tr><tr><td>Power outage<\/td><td>Voltage below 5%; short duration up to 3 minutes, longer than that.<\/td><td>Event count<\/td><td>Article 3.1.10<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">These values describe the voltage supplied from the general grid at the grid connection point (clause 4.1; TS EN 50160:2011, clause 1.1); in a switchboard within the facility, the table is only a comparison reference. For voltage events, the standard only provides definitive values (clause 4.1). In facilities supplied from medium voltage (MV) with their own transformer, the connection point is usually on the MV side, and the MV section of the standard applies (clause 5.1). Furthermore, these characteristics are not intended to be used as electromagnetic compatibility (EMC) levels or user emission limits, and the agreement between the user and the grid operator may supersede the standard (TS EN 50160:2011, clause 1.1).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/elektrik-sistem-analizi\/gerilim-bozulmalari-ve-elektromanyetik-uyumluluk-emc\/\">Voltage Disturbances and Electromagnetic Compatibility (EMC)<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What should a good energy analysis report include?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The first page summarizes where, when, and with what device the measurement was taken, and the main results. This is followed by a \u201csummary of facts and recommendations\u201d table; the following hypothetical example only shows the structure, not a real facility:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Subject<\/th><th>Situation<\/th><th>Priority<\/th><th>Suggestion<\/th><\/tr><\/thead><tbody><tr><td>Supply voltage variations<\/td><td>Within EN 50160 values<\/td><td>None<\/td><td>No action required.<\/td><\/tr><tr><td>Tension THD<\/td><td>Significantly below 8%<\/td><td>Low<\/td><td>No filter is needed; remeasurement will be performed if a new drive is added.<\/td><\/tr><tr><td>Capacitive reactive energy<\/td><td>Capacitive power is supplied at night and on weekends.<\/td><td>High<\/td><td>Reviewing the step and fixed capacitor settings.<\/td><\/tr><tr><td>Neutral current<\/td><td>Near the phase current in a distribution panel<\/td><td>Middle<\/td><td>Neutral cross-section and cable temperature control.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Subsequent sections address each topic with measured values, reference materials, graphs, and interpretations; recommendations are made only where supported by data. Appendices include daily graphs, 10-minute value lists, timestamped event lists, the location of the measurement point on a single-line diagram, and instrument class and calibration information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cHarmonic filter is not needed\u201d is also a valid conclusion; sometimes the problem is the adjustment of the compensation relay or a faulty tap contactor. Compensation with another measuring reactor, a shunt reactor, or a drive unit may require filter operation. The important thing is that the result comes from the data.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Common interpretation errors<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The first mistake is looking at current THD alone. A THD-I that appears very high at low load may indicate a small current in amperes; TDD, voltage THD, and harmonic spectrum should be read together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Secondly, it is necessary to make judgments based on data from a few hours. Even the intensity of prolonged blinking is calculated from twelve Pst values measured in two hours (EN 50160:2022, clause 3.3.5); only 84 Pst values occur in a week.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Thirdly, there is the risk of overlooking capacitive reactive energy at low loads. Compensation that appears balanced during the day can introduce capacitive energy into the grid at night and on weekends due to fixed capacitors and long cables; therefore, the measurement week should include the weekend.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Fourth, there is the confusion between the common connection point and on-site points. IEEE 519-2014 states that its limits apply only to the PCC, not to individual devices or on-site points; on-site values can be significantly higher (clause 5). In industrial installations supplied by dedicated transformers, the PCC is often on the upstream (mostly MV) side of the transformer (clause 1.2). Comparing the current disturbance in the supply line of a single drive with the PCC limit leads to an incorrect conclusion.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">How many days does the energy analysis take?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Recording must last at least one full week, i.e., 7 days continuously; most voltage assessments in EN 50160, as well as IEEE 519\u2019s 10-minute statistics, are based on weekly periods. Installation and dismantling are several hours\u2019 work, and reporting also takes time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Which device is used for energy analysis?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Power quality measurement according to IEC 61000-4-30 is performed with a Class A power quality analyzer with voltage and current inputs for three phases and neutral; flexible or clamp probes are used for current measurement. The standard recommends that the manufacturer declare which parameter is measured in which class (clause 4.1). This declaration and the calibration date of the device should be included in the report.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is energy analysis mandatory?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The legislation we rely on in this article does not contain a general provision requiring power quality measurements at specific intervals from every facility. However, there are indirect links: the final compensation project must include calculations for harmonic load current and resonance frequency (Regulation on the Preparation of Electrical Internal Installation Projects, Article 10\/c-4); and the Energy Efficiency Law defines energy management as activities that include measurement and monitoring (Article 3\/1-p).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Will production stop during the measurement process?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Normally, it doesn't stop; flexible current probes are installed before the circuit is opened, and voltage leads are connected to the appropriate points on the panel. However, opening the panel cover and working near live parts is an electrical job: it should be done by authorized and trained personnel, with personal protective equipment, and, if necessary, by de-energizing the circuit and applying lockout-tagout (LOTO). The connection time is planned with the facility's electrical manager.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sources<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.mevzuat.gov.tr\/mevzuat?MevzuatNo=5627&#038;MevzuatTur=1&#038;MevzuatTertip=5\">Energy Efficiency Law (5627)<\/a>, Regulations concerning studies, energy management, and energy managers \u2014 Official Gazette, 2\/5\/2007, number 26510<\/li>\n\n<li><a href=\"https:\/\/www.mevzuat.gov.tr\/mevzuat?MevzuatNo=19722&#038;MevzuatTur=7&#038;MevzuatTertip=5\">Electricity Grid Regulations<\/a>, Article 14, compensation of reactive energy \u2014 Official Gazette, 28\/5\/2014, number 29013<\/li>\n\n<li><a href=\"https:\/\/www.mevzuat.gov.tr\/mevzuat?MevzuatNo=9721&#038;MevzuatTur=7&#038;MevzuatTertip=5\">Regulation on the Preparation of Electrical Interior Installation Projects<\/a>, Compensation final project content \u2014 Official Gazette 3\/12\/2003, number 25305<\/li>\n\n<li>EN 50160:2022+A1:2025, Voltage characteristics of electricity supplied by general electricity grids.<\/li>\n\n<li>TS EN 50160:2011, Voltage characteristics of electricity supplied by general electrical networks (Turkish terms and scope)<\/li>\n\n<li>IEC 61000-4-30:2008 (CAN\/CSA-C61000-4-30-10), Electromagnetic compatibility \u2014 Part 4-30: Test and measurement techniques \u2014 Power quality measurement methods<\/li>\n\n<li>IEEE Std 519-2014, Recommended practices and requirements for harmonic control in electric power systems.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/test-ve-olcum-hizmetleri\/guc-kalitesi-olcumleri\/harmonik-filtre-secimi\/\">Harmonic Filter Selection: Passive, Active, and Reactor-Based Solutions<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/test-ve-olcum-hizmetleri\/guc-kalitesi-olcumleri\/elektrik-ariza-tespiti\/\">How to find an electrical fault?<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/test-ve-olcum-hizmetleri\/guc-kalitesi-olcumleri\/\">Power Quality Measurements<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Relating to: <a href=\"https:\/\/aesinn.com\/en\/enerji-danismanligi\/enerji-izleme-ve-raporlama\/\">Energy Monitoring and Reporting<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">You can contact us to schedule a week-long energy analysis at your facility. Secure access to the main panel, a current single-line diagram, and your electricity bills from the last twelve months are sufficient to begin the measurement process.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/aesinn.com\/en\/iletisim\/\">Get a quote for measurement \u00bb<\/a><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>The difference between an energy analysis and an energy audit lies in when it's necessary, how to conduct a week-long measurement with a Class A device, and how to read the report.<\/p>","protected":false},"author":1,"featured_media":2568,"parent":4699,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kadence_starter_templates_imported_post":false,"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","slim_seo":{"title":"How to Conduct Energy Analysis? Power Quality Measurement","description":"What is energy analysis and how is it done? A week-long power quality measurement with a Class A analyzer, EN 50160 values, report content, and common interpretation errors."},"_pplb_hide_from_list":false,"footnotes":""},"class_list":["post-6534","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"taxonomy_info":[],"featured_image_src_large":["https:\/\/aesinn.com\/wp-content\/uploads\/aes-thumbnail.png",768,768,false],"author_info":{"display_name":"Emre Metin","author_link":"https:\/\/aesinn.com\/en\/author\/yonetim\/"},"comment_info":"","_hostinger_reach_plugin_has_subscription_block":false,"_hostinger_reach_plugin_is_elementor":false,"_links":{"self":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/pages\/6534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/comments?post=6534"}],"version-history":[{"count":2,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/pages\/6534\/revisions"}],"predecessor-version":[{"id":6552,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/pages\/6534\/revisions\/6552"}],"up":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/pages\/4699"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/media\/2568"}],"wp:attachment":[{"href":"https:\/\/aesinn.com\/en\/wp-json\/wp\/v2\/media?parent=6534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}